Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/30/2008 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
06/02/2008 | DAVE MANN | FIRE | REVIEW | Approved | |
06/03/2008 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Denied | Floodplain Use Permit must be submitted along with supporting documentation for approval of TI. |
06/04/2008 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 4 JUNE 2008 T08CM01481/STAPLES REVIEWED BY RON BROWN CODE REVIEW 2006 IBC/ICC 117.1 DENIED: SEE COMMENTS BELOW GENERAL 1. 20% OF CONSTRUCTION COSTS MUST BE PROVIDED FOR ACCESSIBILITY; IBC 2006 SECTIONS 3906.6 AND 3906.7. SHOW COST BREAKDOWN 2. PROVIDE APPROVED BUILDING OFFICIAL APPEAL FOR USE OF 3/32" LETTERING FONT SIZE SHEET T-1 3. NOTE ACCESSIBILITY CODE AS 2006 IBC/ICC 117.1 SHEET A-1.1 4. PROVIDE STRUCTURAL MOUNTING DETAILS AND STRUCTURAL CALCULATIONS FOR ALL ROOF TOP MOUNTED HVAC UNITS. 5. PROVIDE STRUCTURAL MOUNTING DETAILS AND STRUCTURAL CALCULATIONS FOR ALL ROOF TOP MOUNTED SATELLITE DISH UNITS. SHEET A-2.2 6. DETAIL NUMBERS 1, 2, 4, 5, AND 6: GOVERNING ACCESSIBILITY CODE "ADA" IS NOT CORRECT. RE-REVIEW ALL ACCESSIBILITY DETAILS AND DIMENSIONS AS TO 2006 IBC/ICC 177.1 AND REVIEW DETAILS AND DIMENSIONS ACCORDINGLY. 7. DETAIL 15: a. IS THE ONE HOUR RATED WALL SECTION REFERENCE "G" CORRECT? b. WATER FOUNTAIN TO BE DUAL SPOUT TYPE AS PER ICC 117.1, SECTION 602.4. c. PROVIDE CLEAR SPACE DIMENSION THAT LAVATORY IS MOUNTED d. SHOW ACCESSIBILITY CLEARANCES FOR ALL PLUMBING FIXTURES SHEET A-7, 8, 9 AND 10: 8. PROVIDE ALL STRUCTURAL CALCULATIONS FOR ALL CONCRETE FOUNDATION, COLUMN, LINTEL AND ALL OTHER STRUCTURAL DETAILS NOT MENTIONED BUT REQUIRED. SHEET A-8: 9. PROVIDE DETAIL NUMBERS FOR THE TWO BUILDING WALL SECTIONS 10. PROVIDE STRUCTURAL CALCULATIONS FOR THE SIGN SHOWN TO BE MOUNTED ON THE EXISTING WALL SECTION. SHEET P-2 11. PROVIDE STRUCTURAL MOUNTING DETAILS AND CALCULATIONS FOR THE WATER HEATER. END OF REVIEW |
06/16/2008 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
06/19/2008 | ROBERT SHERRY | WATER | REVIEW | Denied | 1. Reduced pressure backflow prevention assemblies (detail 9/P-2) are required to be installed in locations accessible to Tucson Water. Reference: COT Ordinance 9976, http://www.tucsonaz.gov/water/docs/backflow-ord.pdf |
06/19/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference: Section 106.1.1, IBC 2006. 2. The applicable code for all commercial plumbing projects is the 2006 Uniform Plumbing Code with Local Amendments (see sheet T-1). The drawings have been reviewed per the 2006 UPC but if you wish to use the 2006 IPC, provide an approved appeal to the building official. 3. Provide the developed lengths of the natural gas piping that were used to determine the pipe sizes. If the note on sheet P-1 ("Landlord shall use HP gas distribution to equipment, if available.") is to be considered, a revised plan showing the new gas piping system will be required for review. Reference: Sections 103.2.3 and 1217.0, UPC 2006. 4. Provide a design for the mounting shelf for the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006. 5. Provide a copy of the manufacturer's equipment data for the water heater. The model number and equipment data shown on sheet P-2 does not appear on the manufacturer's web site. Reference: Section 103.2.3, UPC 2006. 6. Revise the location of the vacuum relief for the water heater to conform to the manufacturer's listing information (i.e. with no valves between the vacuum relief and the water heater). Reference: Sections 310.4 and 608.7, UPC 2006. 7. Provide water pressure and water pipe sizing calculations. Show that the branch piping to the flush valves is properly sized with respect to water velocity. Reference: Section 610.1, UPC 2006. 8. Show the drainage fittings (e.g. the floor cleanout shown in detail 14/P-2) installed correctly. Reference: Sections 304.0 and 310.4, UPC 2006. 9. Coordinate the waste and vent piping as shown in the plumbing plan (1/P-1) with that shown in detail 14/P-2. (Note also that the waste line from sink S-1 may not connect to the vent of the floor drain, F-2 as shown in detail 14/P-2). Reference: Sections 103.2.3 and 905.0, UPC 2006. |
06/20/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference: Section 106.1.1, IBC 2006. 2. Coordinate the minimum size of the condensate pipes as shown on sheet P-1 and detail 10/P-2. 3. The HVAC equipment (i.e. RTU-5) shall meet the minimum efficiency requirements. Reference: Section 503.2.2, IMC 2006 4. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson. 5. Provide calculations demonstrating adequate ventilation. Reference: Sections 401.2, 403.3, and 403.2.3, IMC 2006. 6. Provide information on the sequence of operation for the restroom exhaust fan to show that recirculation of the air from the restrooms will not occur. Reference: Section 403.2.1, IMC 2006. 7. Provide smoke detectors in the return air duct, upstream of any outside air connections, for all air distribution systems with a capacity greater than 2,000 CFM and serving multiple rooms. Reference: Section 606.1, IMC 2006 |
06/26/2008 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 520.837.4907 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 106.1.1, IBC 2006. 2. Provide conductor size. Ckt MDP-8. 3. Provide GFCI protection for vending circuits P1-11, P1-13, and P3-21. Reference NEC 422.51. 4. Water Heater Ckt P1-5 is overcurrent protected by a 25A CB, not 30A. Reference NEC 422.11 (E) (3). 5. Provide electrical load on panel schedule for Ckt P3-24 Door Operator. 6. Sheet E-1, Keynote 2. There is no NEC Table 250.94 in the 2005 code. It's Table 250.66. 7. Secondary of the 112.5 KVA transformer is undersized per NEC 240.21 (C) (6) (2). No rounding up, per NEC 240.21 (C). 8. Please provide a fully-sized IG on the transformer secondary. 9. Since the 2-sets of 4/0 were oversized between the 400A replacement CB and the Main Switch 250' away, the #3 GND also must be proportionally oversized per NEC 250.122 (B). 10. Show fault calculations and available fault current at new equipment. Do not leave this up to the Contractor. For example, it appears that there are greater than 14KA available at Panel L. If series ratings are to be allowed, specify line side and load side overcurrent protective devices, and their respective ratings. |
07/01/2008 | GERRY KOZIOL | WWM | REVIEW | Denied | NEEDS ADDRESSING REVIEW NEEDS WASTEWATER 5TH FLOOR CREDIT. EVALUATION |