Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T08CM01471
Review Name: COMMERCIAL NEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/08/2008 | DAVE MANN | FIRE | REVIEW | Denied | Please include the following design criteria to the plans. 1. Flow data (static pressure, residual pressure, GPM) Available from the Fire Department (520) 791-3234 2. The standard to be used in development of sprinkler system. (NFPA 13, NFPA 13R, or NFPA 13D) 3. The hazard classification of the building, including any special hazards. 4. The density required of the water supply. Also, please indicate existing fire hydrant location(s), with dimensions to buildings and/or property lines. Refer to City of Tucson amendments to the 2006 International Fire Code (section 508) for spacing and location requirements. |
05/09/2008 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | |
05/13/2008 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1 THROUGH 18: SEE PROJECT T08CM01470. 19. SHEET 2S-4.5; DETAIL 1: CLEAN UP DETAIL B SO INFORMATION IS LEGIBLE. 20. SHEET 2S-1.1; PLAN: IS TRASH ENCLOSURE SHOWN ON RAMP BETWEEN GRID LINES G AND H CORRECT? CLARIFY. 21. SHEET 2S-1.1; LEGEND: NO LEGEND FOR A SPECIFIC INTERIOR BUILDING SLAB AREA. CLARIFY. 22. SHEET 2S-1.2; CALCULATIONS SHEET FD-2: 3'-6" CONTINUOUS WALL FOOTING AT THE OFFICE IS CALLED OUT IN THE CALCULATIONS. CLARIFY LOCATION ON THE DRAWINGS. |
05/14/2008 | GERRY KOZIOL | WWM | REVIEW | Denied | Bldg #2: need to show location/method of connection to public sewer |
05/19/2008 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Rock - Airport Industrial Center T08CM01470, T08CM01471 & T08CM01472 Building Plan (1st Review) TRANSMITTAL DATE: May 19, 2008 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t08cm01470.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents |
05/27/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The applicable code for all commercial plumbing projects is the 2006 Uniform Plumbing Code with Local Amendments. 2. Provide water supply isometrics. Reference: Section 103.2.3, UPC 2006. 3. Provide a site drawing showing the size, route, and slope of the building sewer. Show the inverts and slope of the building sewer line on the drawing. Reference: Section 103.2.3, UPC 2006. 4. Show the plumbing fixtures and drainage fittings installed correctly and in a manner consistent with the Code and the manufacturer's instructions. Reference: Sections 304.0 and 310.4, UPC 2006 5. Provide the rim elevation of the next upstream sanitary manhole and the first floor elevation. Determine the need for a backwater valve per Section 710.1, UPC 2006, as amended by the City of Tucson. 6. Provide the minimum plumbing facilities required by Table 2902.1 and Section 2902.2, IBC 2006, for business occupancy (e.g. drinking fountain, service sink). 7. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. 8. Show how the specified water heater will fit into the proposed cabinet with adequate space for the piping, circulation pump, and expansion tank. Reference: Section 103.2.3, UPC 2006. 9. The fixture connection sizes called out for the flush valves for the water closets will result in water velocities greater than 8 FPS (note that the flush valves will pass 1.6 gallons in approximately 4 seconds) for the copper piping. Reference: Section A 6.1, UPC 2006 and IS 3-2003, Section 2.6. 10. Indirect waste receptors shall not be installed in a closet or cupboard. Reference: Section 804.1, UPC 2006. |
05/27/2008 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide a site drawing showing the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference: Section 103.2.3, UPC 2006 |
05/28/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Specify the minimum resistance (R-value) of the duct insulation to be used on this project. Reference: Section 503.2.7, IECC 2006, as amended by the City of Tucson. 2. Provide structural calculations to verify that the existing roof is capable of supporting the additional dead load due to the installation of the roof top units in the office area. Reference: Section 302.1, IMC 2006. 3. Revise the ventilation calculations to show that the common ventilation system is sized in accordance with Section 403.3.2, IMC 2006. |
05/28/2008 | JASON GREEN | ENGINEERING | REVIEW | Denied | Building Plan can not be approved prior to site plan or grading plan approval. Provide an approved site and grading plan for building plan review. |
06/05/2008 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 520.837.4907 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Provide a detail and calculations for pole and foundation, prepared and sealed by a Registered Structural Engineer, for all poles over 20' in height. 2. It appears that there are 53 Fixtures SC, not 49. 3. Please note that this site is an industrial site, not zoned for Residential. I checked with your Zoning Plans Examiner, Steve Shields. This will give the Owner a better sense of allowable lumens for his property, and may help with the Outdoor Lighting Calculation. 4. Please demonstrate compliance with the 2006 IECC for Lighting Power Densities for Building Exteriors, as applicable. 5. Please change the #6 CU GND to #4 in the feeder to LP2. Reference NEC Table 250.66. |