Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T08CM01436
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/11/2008 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 520.837.4907 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Sheet E2.1. At DS-1, the 2500A designation by the "Fuse" symbol on the load side of the 2000 designation by the "Circuit Breaker" symbol may not be necessary. Also, 2000 AF is written by the "Circuit Breaker" symbol. 2. Sheet E2.3. Final Feed for Portable Chiller Connection 1. No 600A MOCP. 3. Sheet E2.3. Portable Chiller Connection 1. The 9 fans at 4A each would total 29916VA, not 9972. Portable Chiller 1, at 383 FLA, would total 318,273VA, so load on EDS-2 would be 559,644VA, or 2020A. This also pertains to the service calculation Sheet E2.1. 4. Sheet E2.5. Load Calculation for DS-4 same concerns, as noted in Comments 2 and 3 above. Load appears to be 1842A, not 1105A on DS-4. 5. Designation 2500AF does not correspond to the "Circuit Breaker" symbol at Portable Switchboard #2. Also please clarify the 1200 AT on the load side of the 600AT line side CB. 6. Would like to discuss AFC at chillers. |