Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T08CM01383
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/17/2008 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. PREVIOUS COMMENT: 1/8" LETTERING REQUIRED ON ALL DRAWINGS UNLESS A WRITTEN APPEAL IS APPROVED BY THE BUILDING OFFICIAL, JESSIE SANDERS. THIS APPROVED APPEAL MUST ACCOMPANY DRAWINGS SUBMITTED FOR CHECKING. THIS APPLIES TO ALL DISCIPLINES, ALL SHEETS. |
07/22/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. The ICBO legacy report ES ER-5907 complies with the 2000 IMC but not with the 2006 IMC. If used, fire barrier duct wrap shall comply with the requirements of 506.3.10, exception 1, IMC 2006. 2. Comment not addressed. Provide information to show that the operation of the Type I hood and the hood exhaust fan complies with Section 507.2.1.1, IMC 2006. 3. Provide structural details to show that the Type I and Type II hoods are supported from the building structure in accordance with Section 507.6, IMC 2006 Reference: Section 302.1, IMC 2006. 4. Coordinate the equipment locations shown on sheet S-1 with those shown on sheet M1, e.g. two evaporative coolers versus one and two exhaust fans (for the Type I hood) at 150 pounds each versus one exhaust fan at 220 pounds. Reference: Section 106.3.1, IMC 2006. 5. Coordinate the mechanical floor plan with the architectural floor plan. Reference: Section 106.3.1, IMC 2006. Reference: Section 106.3.1, IMC 2006. 6. Coordinate the electrical requirements for the make up air unit with the electrical drawings (1 HP or 2HP?). Reference: Section 106.3.1, IMC 2006. 7. Clarify the specifications for the make up air unit. The unit is called out as a Master Cool evaporative cooler but with 400 MBH natural gas input. No comparable unit is shown in the Master Cool catalog and no natural gas is being provided in the plumbing design. Reference: Section 106.3.1, IMC 2006. 8. Comment not addressed. Revise the location of the required remote control for the machinery room ventilation to comply with Section 606.9, IFC 2006. The remote control for the machinery room ventilation shall be located "immediately outside of the machinery room and adjacent to its principle entrance." 9. Resubmit the energy code calculations for the building envelope and the mechanical equipment using the correct location for the project. Revise the envelope calculations to include the envelope assemblies. Reference: Sections 104 and 501, IECC 2006. |
07/23/2008 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
07/23/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The plumbing plan has been reviewed based on the 2006 IPC but an approved appeal to the building official allowing the use of the IPC has not yet been received. 2. If the building floor plan has been revised as shown on sheet M1, coordinate the plumbing plan with the revised floor plan. 3. Revise the natural gas piping plan to include all of the connected loads (e.g. the make up air unit) and show the size of the pipe from the meter to the first branch. |
07/28/2008 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/04/2008 | CPIERCE1 | OUT TO CUSTOMER | Completed |
08/04/2008 | SUE REEVES | REJECT SHELF | Completed |