Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T08CM01383
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/14/2008 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | Impact Fee's Do Apply; Central District; 25,582 Square Feet Retail; $80,377.48 |
05/15/2008 | DAVE MANN | FIRE | REVIEW | Approved | |
05/19/2008 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. 1/8" LETTERING REQUIRED ON ALL DRAWINGS UNLESS A WRITTEN APPEAL IS APPROVED BY THE BUILDING OFFICIAL, JESSIE SANDERS. THIS APPROVED APPEAL MUST ACCOMPANY DRAWINGS SUBMITTED FOR CHECKING. 2. SUBMIT SPECIAL INSPECTION FORMS AS REQUIRED. 3. SHEET S1.0; GENERAL STRUCTURAL NOTES: NOTE THAT "FOOTINGS SHALL BE EXISTING" IS INCORRECT. NEW FOOTING AT MEZZANINE COLUMN ON SHEET S3.0. CLARIFY. 4. SHEET S1.0; GENERAL NOTES: REMOVE LAST NOTE UNDER "MASONRY" (CONCERNING WELDING). 5. SHEET S2.0; CALCULATIONS: SECTION 1/S2.0 NOTE INDICATES JOIST MANUFACTURER IS RESPONSIBLE FOR ADEQUACY OF EXISTING ROOF JOISTS UNDER NEW MECHANICAL LOADS, WHILE CALCULATIONS DENOTE EXISTING ROOF JOISTS ADEQUACY. CLARIFY. 6. CALCULATIONS: PAGE 9 INDICATES EXISTING JOIST GIRDER LOAD IS 12.74% GREATER THAN ORIGINAL DESIGN. IS THIS ACCEPTABLE? IF GIRDER MANUFACTURER IS RESPONSIBLE, WE MUST HAVE THEIR APPROVAL SIGNED AND SEALED. VERIFY. 7. SHEET S3.0; MEZZANINE FRAMING PLAN: VERIFY EXISTING FOOTING AT THE NEW W14X61 BEAM (@ WALL BEARING) IS SUFFICIENT. |
05/21/2008 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
05/27/2008 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Subject: 4262 N 1ST Ave T08CM01383 TI--Grocery Store (Sunflower Market) Electrical plan check The electrical plan has been denied for the following items; 1.Provide an Electrical Compliance Certificate per The 2006 IECC with the plans. 2. Include maintenance receptacles for the roof top units and circuit as needed. Raymond T Majuta C of T Development Services Electrical Plan Check 520/837/4988 05/28/08 |
06/03/2008 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Approved | |
06/06/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | The applicable code for all commercial plumbing projects is the 2006 Uniform Plumbing Code with Local Amendments. Provide an approved appeal to the building official if the plans are to be reviewed to the 2006 IPC. |
06/06/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Verify the construction of the wall adjacent to the Type 1 hood is built with non-combustible structure (e.g. metal studs). Reference: Section 507.9, IMC 2006. 2. If used, fire barrier duct wrap shall comply with the requirements of 506.3.10, exception 1, IMC 2006. 3. Clarify how the use of a wood 2"x4" structure with gypsum board located within 3" of the top of the Type I hood complies with the requirements of Section 507.9, IMC 2006. 4. Provide the construction specifications for the make up air ducts within 18" of the Type I hood. Reference: Section 506. 3.1.2, IMC 2006. 5. Provide information to show that the operation of the Type I hood and the hood exhaust fan complies with Section 507.2.1.1, IMC 2006. 6. Provide structural calculations and details to show that the Type I and Type II hoods are supported from the building structure in accordance with Section 507.6, IMC 2006. Reference: Section 302.1, IMC 2006. 7. Smoke detectors required by Section 606.1, IMC 2006 shall be installed in the return air duct, upstream of any outside air connections. 8. Provide information regarding the types of refrigerants being used and the amounts of refrigerant per circuit. Reference Sections 106.3.1 and 1101.0, IMC 2006. 9. Revise the location of the required remote control for the machinery room ventilation to comply with Section 606.9, IFC 2006. 10. Provide an automatic shut-off for the water heater located in the machinery room. Reference: Section 1105.5, IMC 2006. 11. Indicate the location for which the air handling unit mounting detail (sheet M3) applies. Reference: Section 106.3.1, IMC 2006. |
06/06/2008 | ROBERT SHERRY | WATER | REVIEW | Approved | |
06/10/2008 | GERRY KOZIOL | WWM | REVIEW | Denied | NEED TO PERMIT SHELL BLDG |