Permit Review Detail
Review Status: Completed
Review Details: REVISION - SITE
Permit Number - T08CM01238
Review Name: REVISION - SITE
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/12/2010 | MICHAEL ST. PAUL | ZONING | REVIEW | Approved | |
01/12/2010 | ANDREW CONNOR | NPPO | REVIEW | Passed | |
01/12/2010 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Approved | Approved per comment provided by Ivan Milensky indicating that the Hydrologic information from "Final Design Documentation Improvement Project" Dated May 2002 Determines the maximum water surface elevation from the park detention basin (Cell No, 3) to be 2448.5. This project will not have standing water within the parking lot during a Q100 event in excess of 0.5'. The only light per plan that appears to be impacted by regulatory requirements per the topo if the fixture located in the northwest corner of site. Fixture approved per Typical Light Pole Foundation detail numbered S01 and calc sheet completed by Turner Structural Engineering Company , signed and sealed by James Hart (dated 6/2/080, Revision - Sidewalk added to access drinking fountain. 1/12/10. |
01/12/2010 | RONALD BROWN | ZONING HC | REVIEW | Approved | Need 5' X 5' slab of concrete for H/C turn around. |
01/13/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
01/14/2010 | MARTIN BROWN | FIRE | REVIEW | Approved | |
01/14/2010 | ANDREW CONNOR | LANDSCAPE | REVIEW | Passed |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/14/2010 | SUE REEVES | APPROVAL SHELF | Completed |
01/14/2010 | SUE REEVES | OUT TO CUSTOMER | Completed |