Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL-BLDG/FIRE/ZONING/ENG
Permit Number - T08CM01133
Review Name: COMMERCIAL-BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/09/2008 | SUE REEVES | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 04/10/2008 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. PER 2006 IBC, SECTION 1803.3, "THE GROUND IMMEDIATELY ADJACENT TO THE FOUNDATION SHALL BE SLOPED AWAY FROM THE BUILDING AT A SLOPE OF NOT LESS THAN 5%". PROVIDE GRADING TO MEET THIS CRITERIA. 2. ADD THE SECTION CURRENTLY SHOWN ON AN 11X17 INTO THE DRAWING SET. INFORMATION ON THIS SECTION SHOULD INCLUDE THE EXISTING WALL FOOTING SIZE AND DEPTH BELOW GRADE, AND AN ACCURATELY SCALED DEPICTION OF THE NEW CISTERN AND FOUNDATION SYSTEM. THE BOTTOM OF THE NEW FOOTING SHALL NOT BE CLOSER TO THE BOTTOM OF THE EXISTING FOOTING THAN A 2 (HORIZONTAL) TO 1 (VERTICAL) SLOPE. |
| 04/15/2008 | DAVE MANN | FIRE | REVIEW | Approved | |
| 04/25/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Show how the roof of the building will be protected from excessive water weight if the tank overflow is blocked. Reference: Section 1101.11, UPC 2006 and Section 1611.1, IBC 2006. |
| 05/09/2008 | HEATHER THRALL | ZONING | REVIEW | Denied | Zoning Review, Heather Thrall 1) The site plan drawing provided does not meet standards of DS 2-02 with regards to any notes, dimensions or calculations. Thus to help you with this project, my suggestion is to pull the last approved site plan for the address from our city records section and utilize that last approved site plan as the site plan of record for reference for the review of this project. Zoning staff will utilize the presented cistern site plan and elevation in conjunction with the last approved site plan to review the project. 2) once the building code division has approved the application, please check the plan out from the permit counter and obtain a walk thru status to see zoning at the counter. zoning can only approve the building plan once the building code division has approved it. 3) please return to the zoning review counter with the last city approved site plan for the address, and zoning will review the proposed cistern to ensure no conflict with any zoning requirements, such as height, setbacks, etc. is going to occur. 4) please show the setbacks for the cistern from the back of future curb of Fort Lowell, from the adjacent building and from the west property line - for records and inspections. In addition, please list the height of the structure, from grade to the top of the "wall" of the structure, and include a width. 5) Note that landscaping division may need to see this project as well, based upon the photos provided it appears this cistern is going into a prior landscaped area. 5) if you have any questions, email me at Heather.Thrall@tucsonaz.gov |
| 05/28/2008 | JASON GREEN | ENGINEERING | REVIEW | Denied | Floodplain Use Prermit Needed. Open new work flow and bring a FUP to counter for approval. JG |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/28/2008 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |
| 05/28/2008 | GERARDO BONILLA | REJECT SHELF | Completed |