Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: T08CM01096
Parcel: 12801005H

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T08CM01096
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/07/2008 MICHAEL ST. PAUL ZONING REVIEW Approved
04/07/2008 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Passed
04/07/2008 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Approved
04/07/2008 ROBERT SHERRY WATER REVIEW Approved
04/07/2008 RONALD BROWN BUILDING-COMMERCIAL REVIEW Approved
04/07/2008 GERRY KOZIOL WWM REVIEW Approved
04/07/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. The specified lavatory faucets are designed for a flow rate of 2.2 GPM. According to ARS Title 45, Chapter 1, Article 12, the maximum flow rate for lavatory faucets shall be no more than an average of one-half gallon of water per minute at a pressure of eighty PSI or they shall be equipped with a mechanism that causes the faucet to close automatically after delivering no more than one-fourth gallon of water. Reference: Section 402.1, UPC 2003, as amended by the State of Arizona.
2. Show how the temperature of the hot water supply to the public lavatories is controlled to a maximum temperature of 110 degrees Fahrenheit. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006.
04/07/2008 BIANCA RAMIREZ ENGINEERING REVIEW Approved
04/07/2008 MARTIN BROWN FIRE REVIEW Approved
05/05/2008 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review