Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T08CM01036
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/01/2008 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
04/01/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
04/01/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Show how the temperature of the hot water supply to the public lavatories is controlled. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006 |
04/01/2008 | ROBERT SHERRY | WATER | REVIEW | Approved | |
04/01/2008 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | TOILETS ARE NOT ACCESSIBLE |
04/08/2008 | MARTIN BROWN | FIRE | REVIEW | Approv-Cond | |
04/08/2008 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
04/14/2008 | CAGUILA1 | WWM | REVIEW | Needs Review | |
04/14/2008 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | T08CM01036 4/8/08 1. Ckt B-1 is an Air Handler on the panel schedule. Powers receptacle load on Electrical Plan. CORD-CONNECTED, TYPICAL FOR 1035 2. Indicate whether water heater is electrical. If so, add to panel schedule. 3. Provide fault current rating for Panel B. 4. Provide fault calculations for New Panel B. 5. On the Service load, please note that the divisor for the high phase should be 120V, not 230V. |
04/14/2008 | CAGUILA1 | ENGINEERING | REVIEW | Needs Review |