Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T08CM00930
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/21/2008 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | GENERAL: 1. SUBMIT SHELL DRAWINGS FOR REVIEW 2. LETTERING ON ALL DRAWINGS RO BE A MINIMUM OF 1/8" SHEET A0.1 3. BECAUSE ALL BUILDING CODE ANALYSIS IS BASED UPON BUILDING BEING SPRINKLERED, THE SPRINKLERED SYSTEM MUST BE CONSIDERED AS DIFFERED SUBMITTALS. OBTAIN APPROVAL FROM BUILDING OFFICAL, MR. JESSIE SANDERS, FOR SPRINKLERED SYSTEM DEFERRED SUBMITTAL. 4. MAXIUM TRAVEL DISTANCE FOR ONE EXIT IS 100 FEET AS PER IBC TABLE 1019.2 5. REFERENCE TO DEAD END CORRIDORS IS INCORRECT S/B 1017.3.2 6. SEISMIC DESIGN REQUIREMENTS: ? 7. CALCULATED OCCUPANT LOAD IS 15. WHY IS 16 BEING USED FOR TOILET ROOM QUANTITIES AND FIXTURE COUNTS. GO BACK TO 15. 8. PROVIDE ONE DRINKING FOUNTAIN AND ONE MOP SINK AS PER IBC 2006 TABLE 2902.1 SHEET A2.1 9. SINK IN BREAK ROOM MUST BE NO MORE THAN 2'-10 AFF ANSI 308.3.2 10. PROVIDE SAFETY GLAZING IN DOOR SIDELITE SHEET A2.2 11. REFERENCE ANSI 306.3 FOR CLEAR FLOOR SPACE POSITION AT SINK SHEET M1 12. PROVIDE STRUCTURAL DEATILS AND CALCULATIONS FOR ALL ROOF TOP MOUNTED MECHANICAL EQUIPMENT |
03/24/2008 | DAVE MANN | FIRE | REVIEW | Approved | |
03/24/2008 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
03/31/2008 | ROBERT SHERRY | WATER | REVIEW | Denied | Provide a copy of the approved drawings for the shell package of the building to establish the existing conditions of the tenant space. Reference: Sections 106.1 and 106.3, IBC 2006 |
03/31/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide a copy of the approved drawings for the shell package of the building to establish the existing conditions of the tenant space. Reference: Sections 106.1 and 106.3, IBC 2006. 2. Clarify the location of the mounting shelf for the water heater: is it located above or below the ceiling? Reference Sections 103.2.3 and 509.4, UPC 2006 3. Provide a vacuum relief for storage-type water heaters located above any fixture outlets. Reference: Section 608.7, UPC 2006. 4. The branch pipe size called out for the flush valve (1") will result in water velocities greater than 8 FPS. Limit the water velocity to less than 8 FPS for the copper piping. Reference: Section A 6.1, UPC 2006 and Section 2.6, IS 3-2003. 5. Provide upper terminal cleanout for P2A. Reference: Sections 707.4 and 707.11, UPC 2006. 6. Coordinate the connection of the new drain piping to the existing drain piping as shown in detail 1/P1 with the plumbing floor plan. Reference: Sections 103.2.3 and 311.7, UPC. |
03/31/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Provide a copy of the approved drawings for the shell package of the building to establish the existing conditions of the tenant space. Reference: Sections 106.1 and 106.3, IBC 2006. |
04/17/2008 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
04/21/2008 | GERRY KOZIOL | WWM | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/29/2008 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |
04/29/2008 | SHANAE POWELL | REJECT SHELF | Completed |