Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - SITE ALL
Permit Number - T08CM00904
Review Name: RESUBMITTAL - SITE ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/26/2008 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
| 06/26/2008 | RONALD BROWN | ZONING HC SITE | REVIEW | Denied | 26 APRIL 2008 T08CM00904/TMM AND THE ANGEL CAMPUS REVIEWED BY RON BROWN RESUBMITTAL ACCESSIBLE REVIEW 2006 IBC/ICC 117.1 DENIED: SEE COMMENTS BELOW I. SHEET CVR-1: A. DENOTE GOVERNING ACCESSIBILITY CODE; 2006 IBC/ICC 117.1 FOR PRIVATE PROPERTY CORRECTED CV-1 NOT INCLUDED WITH SUBMITTAL B. OK, SHOWN ON OTHER DRAWINGS II. SHEET SD-1: A. OK B. OK C. ACCESSIBLE PARKING: 1. PROVIDE ONE VAN ACCESSIBLE PARKING SPACE AS PER 2006 IBC, SECTION 1106; ICC 117.1, SECTION 503. PROVIDE LARGE SCALE DETAILS SHOWING SIZE OF SPACE AND ISLE, SIGNAGE, ACCESSIBLE ROUTE AND GRADE SLOPES. NOT SHOWN 2. SURFACE SLOPES FOR ALL ACCESSIBLE PARKING AREAS TO BE NO GREATER THAN 1:48, ICC 117.1, SECTION 502.5. PROVIDE SPOT GRADES REFLECTING COMPLIANCE. DETAIL ON SD-1 SHOWS 1:20, SHOULD BE 1:48 3. ALL ACCESSIBLE PARKING SPACES, PRIVATE PROPERTY SIDE WALK RAMPS AND CURB RAMPS AND RAISED MARKED CROSSINGS TO MEET 2006 IBC/ICC 117.1 ACCESSIBLE STANDARDS, SECTION 406. PROVIDE LARGE SCALE DETAILS OF EACH DIFFERENT TYPE SHOWING SIZE OF SPACE AND ISLE, SIGNAGE, ACCESSIBLE ROUTE AND GRADE SLOPES. PROVIDE DETECTABLE WARNINGS AS PER SECTION 406.2 SHOW ALL DETAILS SPECIFIC TO SITE DEVELOPMENT PLAN LAYOUT, NOT "A" TYPICAL PLAN LAYOUTS. NORTH PARKING LOT MARKED CROSSING NEEDS DETECTABLE WARNING AT NORTH END 4. SHOW LOCATIONS OF ALL ACCESSIBLE PARKING SIGNS ON THE SITE DEVELOPMENT PLAN. SHOWN ONLY ON LARGE SCALE PLANS AND AT DETAIL ONE, SYMBOL IS NOT NOTED AND IS IN IMPROPER LOCATION D. ACCESSIBLE DETAILS: 1. OK. E. INSURE COMPLIANCE WITH ICC 117.1, SECTION 307.4, VERTICAL CLEARANCE AT BOTH STAIRS. PLEASE NOTE COMPLIANCE ON DRAWING F. ACCESSIBLE BUILDING EGRESS NEEDS TO BE EVALUATED FOR COMPLIANCE WITH IBC SECTIONS 1007, 1015, 1019, AND 1105. PLEASE NOTE COMPLIANCE ON DRAWING G. PROVIDE "VAN ACCESSIBLE" SIGN TO ACCESSIBLE PARKING SIGN POLE. H. REVISE NOTE 1 TO READ ALL PUBLIC R.O.W. RAMPS TO COMPLY WITH DOT 207; ALL PRIVATE PROPERTY RAMPS TO COMPLY WITH 2006 IBC/ICC 117.1 III. SHEET C2: A. OK B. OK C. OK D. OK END OF REVIEW: PLEASE CALL RON BROWN WITH ANY QUESTIONS OR COMMENTS 837-4908 |
| 06/26/2008 | DAVE MANN | FIRE | REVIEW | Approved | |
| 06/30/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The rim elevation of the next upstream sanitary manhole (2457.73) is less than 12" below the first floor elevation (2458.30). Provide a backwater valve per Section 710.1, UPC 2006, as amended by the City of Tucson. 2. Provide a reduced pressure backflow prevention assembly for the water service. Reference: COT Ordinance 9976, http://www.tucsonaz.gov/water/docs/backflow-ord.pdf |
| 07/02/2008 | PETER MCLAUGHLIN | LANDSCAPE | REVIEW | Denied | See previous landscape review comments. No landscape and irrigation plans were included with the resubmittal. In addition to landscape/irrigation plans, provide a response sheet from the first review comments as to how they are being addressed. |
| 07/03/2008 | PETER MCLAUGHLIN | NPPO | REVIEW | Denied | See previous native plant preservation review comment. No NPPO Exception application was included with the resubmittal. |
| 07/08/2008 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Denied | DATE: July 8, 2008 SUBJECT: 3127 E Adams TO: George Holguin - ADC West LOCATION: 3127 E Adams, T14S, R14E, Section 4, Ward 6 REVIEWERS: Bianca Ramirez, CFM ACTIVITY: T08CM00904 (Second Review) DATE: May 28, 2008 RESUBMITTAL REQUIRED: Site Plan SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed site plan for the above referenced property. Engineering Division does not recommend approval of the site plan at this time. Please address the following review comments prior to the next submittal. Please include a response letter to the comments along with the corrected copies of the site plan. Site Plan: 1. See comments from Ron Brown for all handicap access requirements. 2. Complied 3. Complied 4. Complied 5. Complied 6. Complied 7. Complied 8. Complied 9. Label existing and future sight visibility triangles and provide dimensions on site plan per D.S. 2-02.2.1.10. Provide site visibility triangles for east entrance and for intersection of Adams Street and Country Club. Include both existing and future SVT(s) along Country Club Road. 10. Show all points of egress and ingress including locations and width of driveways and parking area access lanes (P.A.A.L.) per D.S. 2-02.2.1.11. Per AASHTO requirements - demonstrate on site plan that the minimum passenger car minimum design turning radius have been provided. Minimum design turning raduis is 24' and the minimum inside radius is 13.8'. 11. Complied. 12. Complied 13. See comments from Ron Brown for all handicap access comments. 14. Complied 15. Complied 16. Verify that depressed curbing is provided so that onsite drainage is able to enter landscaped areas. Provide detail for depressed curbing or for weir as indicated on plan. Verify that openings are indicated on both C-2 and SD-2. 17. Call out scupper on site plan. 18. Complied 19. Complied 20. Complied 21. Removed from plan. 22. Complied 23. Complied 24. Complied 25. A permit or a private improvement agreement will be necessary for any work performed within the Right-of-way. Contact Permits and Codes at (520) 791-5100 for permit information. 26. Complied 27. Complied 28. Complied 29. Complied 30. Provide phase(s) on site plan. 31. Basins removed - remove any reference to proposed retention basin on site plan. 32. Verify that the information indicated on SD sheet(s) and C sheets match. 33. Submittal indicates that 2 - 6" pipes are proposed. However, theres pipes appear to direct flow to the north. Clarify how outlet drains. 34. Clarify discrepency in labeling of west water harvesting / basin areas and if water harvesting, assure that all sheets match. 35. Explain how positive flow will be achieved. Per spot elevations and elevations of proposed FFE it appears that there will be ponding issues. 36 Extend grading limits indicated on plan to include the area for the proposed bleed pipes. 37. Additional comments may be forthcoming. Drainage Statement: 1. Drainage statement does not indicate how many scuppers need to be installed or the type of scuppers that should be utilized. 2. Discuss maintenance for bleed pipes and indicate where the flow is going. Surrounding spot elevations indicate that the proposed drainage could cause drainage problems for the surrounding buildings. 3. FFE in drainage report do not match what is indicated on site plan and grading site plan. 4. Additional comments may be forthcoming. If you have any questions, I can be reached at 837-4928 or Bianca.Ramirez@tucsonaz.gov Bianca C. Ramirez Engineering Associate City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 837-4928 office (520) 879-8010 fax |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/17/2008 | DELMA ROBEY | APPROVAL SHELF | Completed |
| 07/17/2008 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 07/17/2008 | DELMA ROBEY | REJECT SHELF | Completed |