Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T08CM00804
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/13/2008 | DAVE MANN | FIRE | REVIEW | Denied | Please show location of existing fire hydrant(s). Per C.O.T. amendments to the 2006 IFC, a hydrant must be within 300' of all parts of all structures. Sheet F-6 show conflicting information regarding size of tanks. Please verify and correct. Be advised that a separate permit for the installation of fuel tanks is required through the Fire Department. We will need three copies of the tank installation details, all relevant cut sheets for the materials, and a permit application. |
| 03/17/2008 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 03/18/2008 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 03/21/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | . |
| 03/21/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | . |
| 03/21/2008 | HEATHER THRALL | ZONING | REVIEW | Denied | Zoning will continue the review of the building plan once the site plan has been approved by all divisions, and the building plans are approved by structural review. |
| 03/21/2008 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 03/21/2008 | RSHERRY1 | WWM | REVIEW | Passed | No wastewater plumbing fixtures. |
| 04/04/2008 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 520.837.4907 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Provide for bonding of the metal building according to the requirements of NEC 250.104 (C). 2. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 106.1.1, IBC 2006. 3. Lighting Code Compliance calculations consider Fixtures A and B to both have the same lumen output, whereas according to the Luminaire Schedule there are 7 shoeboxes for A and a total of 16 for B. 4. Put compact fluorescent fixtures on the Luminaire Schedule, and add the exterior on to the compliance calculations for outdoor lighting. 5. Add a note on the plans: "Special Inspection required for exterior lighting fixtures per Tucson Lighting Code Section 16." 6. Provide cut sheets for all exterior lighting fixtures. 7. Provide an electrical circuit(s) for the CCTV. 8. Provide a disconnecting means for the fuel pumps. 9. Please remove the redundant #4 GND between the meter and the utility transformer. The fourth 4/0 conductor will convey any fault current back to the source on the line side of the service disconnecting means. 10. On the One Line Diagram, please change "#2 EQUIP. GROUND" to read "#2 MBJ." 11. Please specify that the conduit for Fixtures B shall be sealed at both ends. Similar to the direction provided on Sheet E1, Keynotes 1,2, and 5. 12. Provide exact specification for the type of conduit intended to be run under Class I Division 2 areas. |
| 05/05/2008 | PAUL MACHADO | ENGINEERING | REVIEW | Denied | Site plan must be approved prior to the approval of the building plans. PM. 05-05-08. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/28/2008 | GERARDO BONILLA | OUT TO CUSTOMER | Completed |
| 05/28/2008 | SUE REEVES | REJECT SHELF | Completed |