Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T08CM00768
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/07/2008 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
03/10/2008 | DAVE MANN | FIRE | REVIEW | Approv-Cond | |
03/10/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | Show that the building envelope, mechanical systems, service water heating, and lighting meet the requirements of ASHRAE/IESNA 90.1-2004. Reference: Sections 501.1 and 501.2, IECC 2006, as amended by the City of Tucson. |
03/10/2008 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
03/10/2008 | ROBERT SHERRY | WATER | REVIEW | Approved | |
03/10/2008 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | TABLE 2902.1 OF IBC REQUIRES ONE WATER CLOSET AND ONE LAVAOTRY PER 50 OCCUPANTS. REVISE DRAWINGS TO MEET THIS REQUIREMENT. |
03/10/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the specification for P-1 to include the requirement that the faucet shall remain operable for a minimum of 10 seconds. Reference: Section 606.4, ICC/ANSI A117.1-2003. 2. Provide the minimum plumbing fixtures required for educational occupancy per Chapter 29, IBC 2006. 3. Clarify how the proposed instantaneous water heaters will work with the thermostatic mixing valve shown in detail 205/P3. |
04/16/2008 | CAGUILA1 | WWM | REVIEW | Needs Review | |
04/16/2008 | CAGUILA1 | ZONING | REVIEW | Needs Review | |
04/16/2008 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |