Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL-BLDG/FIRE/ZONING/ENG
Permit Number - T08CM00612
Review Name: COMMERCIAL-BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/28/2008 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. CLARIFY ACCESSIBLE ENTRY TO SKATING AREA 2. INSURE STRUCTURAL CALCULATIONS ARE SUBMITTED WITH THE SHADE STRUCTURE AND LIGHTING POLE DEFERRED SUBMITTALS 3. REQUIRED LETTERING SIZE FOR ALL DRAWING TEXT IS 1/8" 4. SHEET SP-09: CHANGE REFERENCE FROM 2003 IBC TO 2006 IBC AND INSURE ALL CALCULATIONS ARE IN COMPLIANCE WITH 2006 IBC |
03/28/2008 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
03/28/2008 | DAVE MANN | FIRE | REVIEW | Approved | |
03/31/2008 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
04/22/2008 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Santa Rita Skate Park T08CM00612 Building Plan (1st Review) TRANSMITTAL DATE: April 22, 2008 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site plan with the next building plan submittal. 3. Once the above comment has been addressed zoning is willing to provide and over-the-counter review. Please call or email to schedule an appointment. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t08cm0 612.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents |
05/21/2008 | JASON GREEN | ENGINEERING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/22/2008 | CPIERCE1 | OUT TO CUSTOMER | Completed |
05/22/2008 | SUE REEVES | REJECT SHELF | Completed |