Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T08CM00604
Parcel: 13734001E

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T08CM00604
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/22/2008 MARTIN BROWN FIRE REVIEW Approved
02/22/2008 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review IMPACT FEE'S DO APPLY; WEST DISTRICT; 1,200 SQUARE FEET OF RETAIL? SPACE; $4,771.20 - PLEASE NOTE THERE WILL BE A 2.54% INCREASE IN IMPACT FEE'S ON 3/10/08
02/27/2008 ERIC NEWCOMB BUILDING-COMMERCIAL REVIEW Denied 1. SHEET A0: VERTICAL GRAB BAR REQUIRED IN RESTROOM PER ANSI A117.1, SECTION 604.5.
2. CITY OF TUCSON REQUIREMENT TO HAVE ALL LETTERING ON PLANS MINIMUM OF 1/8". YOU MAY APPEAL THIS THROUGH THE BUILDING OFFICIAL, JESSIE SANDERS.
3. PROVIDE SHELL BUILDING DRAWINGS.
4. INDEX SHEET: CHANGE BUILDING AREA TO INCLUDE ENTIRE SHELL BUILDING. OCCUPANT LOAD CAN BE BASED ON TENANT SPACE AREA.
03/03/2008 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied ELECTRICAL NOTES; MUST PROVIDE SERVICE ONE LINE DIAGRAM SHOWING SIZE,AMPACITY ,ETC AND HOE CONNECTED TO SHELL SERVICE. THERE WERE NO SHELL DRAWINGS PROVIDED WITH THIS PLAN.
RAY MAJUTA,DSD,ELECTRICAL PLANS EX. 3/4/08
03/18/2008 ROBERT SHERRY WATER REVIEW Denied Provide a copy of the approved drawings for the shell package of the building to establish the existing conditions for the water meter and any backflow devices serving this tenant space. Reference: Sections 106.1 and 106.3, IBC 2006
03/18/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide a copy of the approved drawings for the shell package of the building to establish the existing conditions of the tenant space and the shared plumbing systems. Reference: Sections 106.1 and 106.3, IBC 2006.
2. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). (A 3/32", all-upper-case font may be allowed with an appeal to the building official.) Reference: Section 106.1.1, IBC 2006.
3. Show that the location of the public restroom complies with Section 1104.5, IBC 2006.
4. Provide a vacuum relief for a storage-type water heater located above any fixture outlets. Reference: Section 608.7, UPC 2006
5. Verify that the provided water calculations are consistent with the shell building water calculations. Reference: Sections 610.4 and 610.5, UPC 2006.
6. Provide upper terminal cleanouts on horizontal drainage pipes exceeding 5 feet in length (horizontal drain lines serving sinks require cleanouts regardless of length). Reference: Section 707.4, UPC 2006
7. Provide a direct waste connection for the wash and rinse sections of the 3-compartment sink, with an indirect connection for the sanitizing compartment only. Reference: Sections 304.0 and 801.2.3, UPC 2006.
03/18/2008 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide a copy of the approved drawings for the shell package of the building to establish the existing conditions of the tenant space. Reference: Sections 106.1 and 106.3, IBC 2006.
2. Provide calculations demonstrating adequate ventilation. Reference: Section 401.2, IMC 2006.
03/20/2008 GERRY KOZIOL WWM REVIEW Denied 1:PAPA MURPHY'S-TAKE 'N' BAKE-ISSUED W/ GREASE INTERCEPTOR-PREP SINK INDIRECT
2: NEED TO SUBMIT WASTEWATER APPROVED SHELL PLUMBING DRAWING & REVISED WASTEWATER APPROVED DRAWING (PERMIT #PT07S02397 & PT07S04075) FOR CREDIT EVALUATION

Final Status

Task End Date Reviewer's Name Type of Review Description
03/25/2008 VFLORES1 OUT TO CUSTOMER Completed
03/25/2008 SHANAE POWELL REJECT SHELF Completed