Permit Number: T08CM00552
Parcel: 11106395A

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T08CM00552
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/31/2008 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Approved
04/14/2008 GERRY KOZIOL WWM REVIEW Approved
04/21/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. The calculations provided on sheet 2 of 8, are incorrect. Table 11-2 is not applicable in this situation, see Table 11-1 for the required roof drain size and the follow the instructions in Section 1101.11.2.1, UPC 2006 for sizing the scupper. Basically, in your case, a scupper that is acting as both a primary and secondary roof drain will be a rectangular opening with a minimum width equal to the circumference of the required roof drain and a height equal to 6" (150% of the minimum scupper height).
2. Comment not addressed. Provide equipment data for the water heater. Reference: Section 103.2.3, UPC 2006.
3. Provide cleanouts sized per Section 707.11, UPC 2006. The 3" and 4" drain pipes require appropriately sized cleanouts.
04/23/2008 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved