Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T08CM00552
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/31/2008 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 04/14/2008 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 04/21/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The calculations provided on sheet 2 of 8, are incorrect. Table 11-2 is not applicable in this situation, see Table 11-1 for the required roof drain size and the follow the instructions in Section 1101.11.2.1, UPC 2006 for sizing the scupper. Basically, in your case, a scupper that is acting as both a primary and secondary roof drain will be a rectangular opening with a minimum width equal to the circumference of the required roof drain and a height equal to 6" (150% of the minimum scupper height). 2. Comment not addressed. Provide equipment data for the water heater. Reference: Section 103.2.3, UPC 2006. 3. Provide cleanouts sized per Section 707.11, UPC 2006. The 3" and 4" drain pipes require appropriately sized cleanouts. |
| 04/23/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved |