Permit Review Detail
Review Status: Completed
Review Details: RESIDENTIAL BLDG/ZONING/ENGINE/NPPO
Permit Number - T08CM00552
Review Name: RESIDENTIAL BLDG/ZONING/ENGINE/NPPO
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/27/2008 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 03/27/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide water isometrics and waste and vent isometrics. Reference: Section R106.1.1, IRC 2006. 2. Provide the sizing calculations for the water distribution piping. If the materials used for the water distribution are not as specified on the drawing, provide additional sizing calculations for the alternate material. Reference: Sections R106.1.1 and P2903.7, IRC 2006. 3. Based on the submitted calculations, the demand for this activity is 15 GPM. Tucson Water limits a 5/8" meter (there are no ¾" meters) to demands of 10 GPM or less and 1" meters to demands of 25 GPM or less. 4. Provide the dimensions of the scuppers for the roof drainage. 5. Provide equipment data for the water heater. Reference: Section R106.1.1, IRC 2006. 6. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, and valves. |
| 03/27/2008 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. FLOOR PLAN (SHEET 1) AND FOUNDATION PLAN (SHEET 2): INDICATE ALL HOLDOWNS PER BRACE PANEL SCHEDULE ON SHEET 1. 2. COMPLETE BEAM POST FOOTING CONN. SECTION ON SHEET 2. |
| 03/27/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide calculations to show that the building complies with the requirements of Section 401.2, IECC 2006. 2. Show how makeup air will be provided to the dryers. 3. Clarify the type of rooftop unit being installed. The units are called out as both heat pumps and gas-fired A/C units. |
| 03/27/2008 | GERRY KOZIOL | WWM | REVIEW | Denied | 1:needs to show location & method of connection to public sewer 2:needs 8th floor wastewater review of location & method of connection to public sewer. 3:needs wastewater review of easements joint use agreement |
| 03/28/2008 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/08/2008 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 04/08/2008 | SHANAE POWELL | REJECT SHELF | Completed |