Permit Number: T08CM00549
Parcel: 12216224A

Review Status: Completed

Review Details: RESUBMITTAL - SITE ALL

Permit Number - T08CM00549
Review Name: RESUBMITTAL - SITE ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/11/2008 DAVE MANN FIRE REVIEW Approved
08/11/2008 RONALD BROWN ZONING HC SITE REVIEW Denied 1. Sheet 1, Curb Access detail: Change all ADA accessible code references t0 2006 IBC, ICC 117.1
2. Need Registrant seal for all drawings
3. For all new concrete walk accessible routes, need a physical barrier from parking paving, reference zoning comments and show compliance with slope requirement,
ICC 117.1, section 403.3.
4. Accessible route connection to existing wall and gate does not work. Provide a large scale detail showing code compliance to 2006 IBC, ICC 117.1, Chapter 4, specific Section 404 .
5. Provide accessible route connection to Public R.O.W. walkway.
6. Clarify East drive entrance form Alvernon, plan detail is jubmled and unclear.
08/11/2008 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Emmanuel Baptist Church - Modular Office Building
T08CM00549
Site Plan (2nd Review)

TRANSMITTAL DATE: August 11, 2008

COMMENTS: Please resubmit revised drawings and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. This site plan was reviewed for compliance with the City of Tucson Development Standards (D.S.) and Land Use Code (LUC) for full code compliance for the area of expansion only.

2. Based on discussions with Wayne Bogden, DSD Zoning Administration, the proposed use may not be allowed on an R-2 zoned property. There may also be issues with required vehicle and bicycle parking and loading spaces as the proposed use not part of the Emmanuel Baptist Church. As per our telephone discussion submit a letter to Wayne Bogden requesting clarification in regards to the separate use.

3. D.S. 2-02.2.1.A.7 The location of the future curb is not correct. Future curb location for a right-of-way (ROW) width of 120 feet is nine (9) feet into the ROW. This said the future curb location for Alvernon Way would be located nine (9) feet east of the east property line. Show the future curb and provide the setback dimension from the back of future curb. Zoning acknowledges that the proposed building will meet the setback requirements.

4. On the handicapped vehicle parking space detail include the maximum allowed surface slopes, see ICC/ANSI A117.1-2003 Section 502.5.

5. D.S. 2-02.2.1.A.10 The future sight visibility triangles (SVTs) are not shown correctly. Show the future SVT's based on the location of the future curb, see comment 3.

6. D.S. 2-02.2.1.A.12 Per D.S. 2-08.4.1 The proposed new concrete walk, southern end, that provides the required connection between the proposed modular office and the existing buildings on site must be physically separated from the vehicle use area.

7. This comment was not addressed. Provide the required information for the existing sign shown on the plan. I the proposed sign will be done under a separate permit provide a note on the plan stating "SIGN UNDER SEPARATE PERMIT. D.S. 2-02.2.1.A.13 Zoning acknowledges the existing signs shown on the plan. Provide the type, size, and height for each sign.

8. Additional comments may be forth coming depending on how each comment has been addressed.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956.

I:\planning\site\t08cm00549-2nd.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents
08/14/2008 ANDREW CONNOR LANDSCAPE REVIEW Denied 1. The site plan and landscape plan must show identical site layout to avoid conflict between the two plans. Ensure that all changes to the site plan are reflected on the landscape plan including future curb and site visibility triangles (see Zoning comments for verification).

2. Note: All landscaping and screening must comply with the sight visibility requirements of Development Standard 3-01.0. Plant materials located within sight visibility triangles should consist of ground cover or low-growing vegetation of a species that will not grow higher than thirty (30) inches.

3. Include with re-submittal any administrative decision documentation for site use. Indicate on the lower right hand corner of the site plan and any conditions imposed (see Zoning comment #2).

4. Additional comments may apply.
08/15/2008 ANDREW CONNOR NPPO REVIEW Approved
08/21/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Provide the rim elevation of the next upstream sanitary manhole. Compare the rim elevation with the first floor elevation and determine the need for a backwater valve per Section 710.1, UPC 2006, as amended by the City of Tucson.
2. Show a reduced pressure backflow prevention assembly for the water service to the new modular building. Reference Section 27-75 (27), COT Ordinance 9976, http://www.tucsonaz.gov/water/docs/backflow-ord.pdf
09/10/2008 LOREN MAKUS ENGINEERING REVIEW Denied DATE: September 10, 2008
SUBJECT: Site Compliance Permit
TO: Jerry Cox
LOCATION: 1825 N Alvernon, T14S, R14E, Section 4, Ward 6
REVIEWERS: Loren Makus, EIT
ACTIVITY: T08CM00549 (Second Review)


RESUBMITTAL REQUIRED: Site Plan

SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed site plan for the above referenced property. Engineering Division does not recommend approval of the site plan at this time. Please address the following
review comments prior to the next submittal.

Include a response letter to the comments along with the corrected copies of the site plan.

Site Plan:
Show the future sight visibility triangles along with the existing sight visibility triangles. The future triangles should be aligned with the future curb location which is nine feet from the edge of the future right-of-way.

List the estimate cut and fill quantities for this project as indicated in the previous review.

Show the drainage patterns for the roof of the modular building. Show that roof drainage will not be directed over adjacent sidewalks.

Loren Makus
Senior Engineering Associate
Loren.makus@tucsonaz.gov

Final Status

Task End Date Reviewer's Name Type of Review Description
09/17/2008 DELMA ROBEY OUT TO CUSTOMER Completed
09/17/2008 SUE REEVES REJECT SHELF Completed