Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T08CM00528
Parcel: 140411000

Review Status: Completed

Review Details: RESUBMITTAL - SITE

Permit Number - T08CM00528
Review Name: RESUBMITTAL - SITE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/12/2008 TERRY STEVENS ZONING REVIEW Approved
08/19/2008 JASON GREEN ENGINEERING REVIEW Denied DATE: August 20, 2008
SUBJECT: 6850 S Brosius Site Plan- 4th Engineering Review
TO: Rick Engineering Company ATTN: Dan Castro
LOCATION: T15S R14E Sec16, Ward 5
REVIEWERS: Jason Green, CFM
ACTIVITY: T08CM00528 (Site Plan)


SUMMARY: Engineering Division of Development Services Department has received and reviewed the revised site plan (T08CM00528), Drainage Report (Rick Engineering Company, 14FEB08 revised 01MAY08), and the Supplement No. 2 (GEC, 12AUG08) to the Geotechnical Exploration Report (GEC, 08APR08) for the above referenced property. Engineering Division does not recommend approval of the site plan application at this time. The Drainage Report was reviewed for site plan purposes only. The following items need to be addressed:


SITE PLAN COMMENTS:

1) Complied.

2) Complied. Email received from Lance Peterson, P.E. Engineering Project Manager Streets and Traffic Maintenance stating approval of materials within the right-of-way.

3) Complied.

4) Complied.

5) Complied.

6) Complied.

7) DS Sec.2-02.2.1.A.16: Revise the site plan to label and dimension all drainage infrastructures per the submitted Drainage Report. Verify that all drainage improvements that are within the Drainage Report are clearly labeled with details and dimensions on the revised site plan. Specifically:

a) Complied.

b) Revise Sheet 3 of the site plan to clearly label the 15-foot curb opening (provide keynote for the associated detail) for the 15-foot access ramp into Basin 1P. Provide the minimum 15-foot width dimension for the access point and provide a reference to a Standard Detail (SD) for Public Improvements (SD 209 and 210). If a SD is to be modified (SD210) then a separate detail must be provided in plan view to show that the transition from vertical curb to wedge curb and then from wedge curb to the required Handicap Access Ramp is constructible with the site layout. Per SD 210 the transition length required for vertical curb to wedge curb is 10-feet, the site plan if scaled only shows a 2.5-3-foot transition.

c) Complied.

d) Complied.

e) Revise the Site Plan to clearly label the proposed storm water grates and catch basins that are proposed within the vehicular use area on the west side of Building #2. This comment was not fully addressed. The storm water grates and catch basins are shown in plan view however they are not labeled with a keynote or with a Standard Detail reference. All drainage infrastructures must me clearly labeled in plan view or with a detail to assure site layout dimensions.

8) Complied:

a) Complied.

b) Complied

9) Complied.

10) Complied.

11) Complied.

12) Complied.

13) Complied.

14) Complied.

15) Restated: Review and approval from TDOT Permits and Codes for all improvements within the public right-of-way will be required. A right-of-way use permit application will be required prior to construction. Refer to the following links for TDOT Forms and applications:

a) http://www.tucsonaz.gov/dsd/Forms_Fees___Maps/Applications/applications.html /

b) http://www.dot.ci.tucson.az.us/engineering/pia.php

c) Or contact Thad Harvison at 837-6592 for all additional questions regarding r-o-w.

16) Restated: Be advised that further comments may be forth coming on resubmittal of the site plan.


GEOTECHNICAL REPORT:

17) Complied.


GRADING PLAN:

18) Restated: DS Sec.11-01.2.1: A grading permit application (T08BU00855) has been applied for on this project and comments will be provided under separate letter. The grading plan can not be approved prior to site plan approval.

19) Restated: Please ensure that any future grading plan will be consistent with the site plan and Drainage Report. Grading standards may be accessed at: http://www.ci.tucson.az.us/dsd/DevStandsTOC.pdf

20) Restated: Arizona Pollutant Discharge Elimination System (AZPDES) requirements are applicable to this project. Stormwater Pollution Prevention Plans (SWPPP) and text addressing stormwater controls for all areas affected by construction activities related to this development have been submitted and will be reviewed with the grading plan submittal. For further information, visit www.adeq.state.az.us/environ/water/permits/stormwater.html


GENERAL COMMENTS:

Please provide a revised site plan and all associated supplemental information (for record keeping purposes) that address the comments provided above. For expedite purposes the site plan can be reviewed over the counter (DSD Engineering Division comment only and with a scheduled meeting time set up by the applicant) for stamp approval once all items have been addressed.

If you have any questions or to schedule an appointment I can be reached at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
COT Development Services

Final Status

Task End Date Reviewer's Name Type of Review Description
08/22/2008 GERARDO BONILLA OUT TO CUSTOMER Completed