Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T08CM00231
Parcel: 137055110

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T08CM00231
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/23/2008 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. SITE PLAN IS ILLEGABLE
2. NEED DUAL LEVEL WATER FOUNTAIN AS PER IBC 2006 SECTION 2902, TABLE 2902.1, ITEM 6 AND ANSI 117.1 SECTION 602.4
3. ALL LETTERING TO BE MINIMUM OF 1/8" HIGH
4. PROVIDE STRUCTURAL ENGINEER DETAILING AND CALCULATIONS FOR WATER HEATER SUPPORT
01/23/2008 MARTIN BROWN FIRE REVIEW Approved
01/23/2008 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
01/24/2008 GERRY KOZIOL WWM REVIEW Approved
02/06/2008 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 106.1.1, IBC 2006.
2. Provide a copy of the approved shell building drawings for reference. Reference Section 106.3.1, IMC 2006.
3. Clarify the ventilation calculations with regard to which code is being used to determine the required amount of outside air, i.e. ASHRAE 62.1-2004 or IMC 403.3. Section 403.3, IMC 2006, as amended by the City of Tucson allows the use of the ASHRAE 62-1-2004 ventilation calculation procedure provided that the default occupant densities and combined outdoor air rates are used. Note that the "lobby" of the suite is not a "retail sales floor".
02/06/2008 ROBERT SHERRY WATER REVIEW Approved
02/07/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 106.1.1, IBC 2006.
2. Provide a copy of the approved shell building drawings for reference. Reference Section 103.2.3, UPC 2006.
3. The existing 2" service to the building is not capable of accommodating a demand of 100 GPM without exceeding the maximum velocity of 8 FPS. Reference Section 610.12, UPC 2006.
4. Provide the manufacturer's listing information for the batch freezer, E6, to clarify how the two water connections will be used. Reference Section 103.2.3, UPC 2006.
5. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference Section 413.1, UPC 2006 and Section 504.3, IECC 2006.
6. Provide a floor drain in the kitchen. Reference Sections 411.2.2 and 704.3, UPC 2006.
7. The fixture schedule on sheet A-2 calls for the installation of an electric water cooler, X10. Coordinate the plumbing and architectural designs. Note that a drinking fountain will have to comply with the requirements of Section 1109.5, IBC 2006.
02/11/2008 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 520.837.4907 OR EMAIL AT Linda.Buczynski@tucsonaz.gov
IF YOU CARE TO DISCUSS.

1. The Series Rating Notes, #31 on Sheet 1815, are redundant to the fully rated panels at this location. Please remove.
2. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 106.1.1, IBC 2006.
3. One-Line Diagram calls for all new utility meters. This does not appear to be necessary for the Cold Stone Creamery occupancy.
4. It appears that all panels are existing with the exception of new Panels CSC and CSC2. Please clarify this on the line diagram

Final Status

Task End Date Reviewer's Name Type of Review Description
02/15/2008 CPIERCE1 OUT TO CUSTOMER Completed
02/15/2008 SUE REEVES REJECT SHELF Completed