Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T08CM00189
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/18/2008 | CPIERCE1 | BUILDING-COMMERCIAL | REVIEW | Needs Review | |
03/18/2008 | ROBERT SHERRY | WATER | REVIEW | Approved | |
03/18/2008 | CPIERCE1 | MECHANICAL-COMMERCIAL | REVIEW | Needs Review | |
03/18/2008 | DAVE MANN | FIRE | REVIEW | Approved | |
03/18/2008 | CPIERCE1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
03/18/2008 | CPIERCE1 | ZONING | REVIEW | Needs Review | |
03/18/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Show how installing the air gap fitting with a continuous waste connection to the tailpiece of P4 complies with Section 1001.2, UPC 2006. Reference: Section 103.2.3, UPC 2006. 2. The structural calculations for the water heater support are adequate but the construction information contained in the calculations (e.g. component sizes etc.) shall be placed on the drawing. Reference: Sections 310.0 and 314.5, UPC 2006. 3. Considering the wide range of water supply temperatures in Tucson, show how the temperature of the hot water supply to the public lavatories is to be set on the faucet limit stops. Reference: Section 413.1, UPC 2006 and Section 504.3, IECC 2006. 4. Comment not resolved; provide design pressure calculations and developed pipe length. Provide calculations showing how the water supply piping has been sized. Reference Sections 610.4 and 610.5, UPC 2006. 5. Provide upper terminal cleanouts for P4 and P5; show the cleanout for the toilet chase on the riser diagram. Reference: Section 707.4, UPC 2006. 6. Correct the natural gas branch pipes to the new RTU's. Reference Sections 103.2.3 and 1217.0, UPC 2006. |