Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T08CM00189
Review Name: RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/28/2008 | PAUL MACHADO | ENGINEERING | REVIEW | Approved | |
02/28/2008 | MARTIN BROWN | FIRE | REVIEW | Denied | Per 2006 IFC, table 1019.2, travel distance for buildings with one exit is limited to 75'. Plans indicate 90' travel distance. The exception for not requiring rated corridors (section 1017, #4) does not apply. |
02/28/2008 | GERRY KOZIOL | WWM | REVIEW | Approved | |
02/29/2008 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Include a separate architectural site plan showing all site amenities: a. Drive and walkways 1. All accessible routes from public transportation to the accessible front entrances are to be identified 2. All accessible routes from accessible parking spaces to accessible front entrances are to be identified 3. Slopes for all accessible routes are to be noted and further clarified by providing spot elevations at appropriate locations to evaluate slope design b. Parking layout 1. Show accessible spaces plus spot elevations for slope compliance c. Paved areas and types of paving d. Building footprint and configuration with entrances and exists identified e. Landscape areas f. Property lines g. Streets, easements and R.O.W.s h. Fences, curbs, ponding areas, drainage structures and etc i. Dimension all elements of construction shown on the site plan 2. Incorrect dimensions shown for vertical grab bar, ref ANSI 117.1 604.5.1 3. Corridor design shown presents a single enity exit corridor systm for all 49 occupants of building. With no sprinklers, maxium corridor load is 30. Corridor must be 1 hour rated. |
03/18/2008 | CAGUILA1 | WATER | REVIEW | Needs Review | |
03/18/2008 | CAGUILA1 | MECHANICAL-COMMERCIAL | REVIEW | Needs Review | |
03/18/2008 | CAGUILA1 | ZONING | REVIEW | Needs Review | |
03/18/2008 | CAGUILA1 | PLUMBING-COMMERCIAL | REVIEW | Needs Review | |
03/18/2008 | CAGUILA1 | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review |