Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T08CM00178
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/17/2008 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
| 02/01/2008 | TERRY STEVENS | ZONING | REVIEW | Approved | |
| 02/01/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Clarify the condition of the wall located behind the hood. The drawing does not indicate the wall construction nor does it indicate how the window will be addressed or how the wall surface will comply with Section 507.9, IMC 2006. 2. The structural drawings shall be part of the drawing set. 3. Show that the construction of the make up air complies with Section 506.3.1.2, IMC 2006. 4. Show how the location of the new exhaust fan complies with with Section 506.5, IMC 2006. 5. Show how the new evaporative cooler is to be drained and the termination point of the drain. 4. Revise the minimum font size to 1/8" (all upper case). |
| 02/01/2008 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 02/01/2008 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 02/01/2008 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. ADD DRAWINGS FROM CALCULATIONS TO THE DRAWING SET SHOWING EXISTING BEAM REVISION FOR MECHANICAL SUPPORT. 2. FIX WINDOW POSITION. |
| 02/01/2008 | RSHERRY1 | WWM | REVIEW | Passed | No new plumbing fixtures. |
| 02/01/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | . |
| 02/01/2008 | DAVE MANN | FIRE | REVIEW | Approved | |
| 03/20/2008 | BETH GRANT | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Approved |