Permit Number: T08CM00021
Parcel: 13001004B

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T08CM00021
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/22/2008 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
02/27/2008 RONALD BROWN BUILDING-COMMERCIAL REVIEW Denied 1. PROVIDE WATER COOLER CLEARANCES AS PER ANSI 602.5
2. AT BOTH TOILET ROOM DOORS, PROVIDE 18" CLEAR ON INSIDE STRIKE JAMB AS PER ANSI 404.2.3.1 (a)
3. DIMENSION BOTH TOILET ROOMS
4. PROVIDE ALL TOILET ROOM ELEVATIONS SHOWING ACCESSIBILITY REQUIREMENTS FOR ACCESSORY AND FIXURE DIMENSIONS AND MOUNTING HEIGHTS. SHOW WAINSCOATING AS PER IBC 2006, SECTION 1210.2.
5. PROVIDE ROOM FINISH SCHEDULE
6. PROVIDE DOOR AND HARDWARE SCHEDULE
7. PROVIDE 1'-0" CLEARANCE AT INSIDE STRIKE JAMB AT BREAKROOM EXIST DOOR.
03/11/2008 RAY MAJUTA ELECTRICAL-COMMERCIAL REVIEW Denied ELECTRICAL DRAWINGS HAVE BEEN DENIED FOR THE FOLLOWING ITEMS,
1.THE WATER HEATER ON THE CUT SHEET IS SHOWING CONNECTION TO A 277 VOLT SUPPLY,IT IS SHOWN CONNECTED TO A 208 VOLT SUPPLY.
2. PLEASE INSERT A NOTE ON SHEET E-3 FOR CONTRACTOR TO COMPLY WITH NEC 2005, 700.8 INDICATING TYPE AND LOCATION OF ON SITE EMERGENCY POWER SOURCE.
3. THE DRAWING OF THE SERVICE ON THE WEST WALL OF SHEET E-2 ONLY SHOWS ON E DISCONNECT,ONE TRANSFORMER,ONE TRANSFER SWITCH. THE ENTIRE SERVICE EQUIPMENT INCLUDING THE UTILITY SERVICE, THE TWO CT CANS,OTHER TWO 400 AMP DISCONNECTS, ALL INCLUDED AS SHOWN ON ONE LINE DIAGRAM SHEET E-3. THIS PROVIDES VALUABLE INFORMATION ON ALL EQUIPMENT INVOLVED FOR THE INSPECTOR.
4.NEC 2005-250.58, THE GROUNDING ELECTRODE SYSTEM FOR THE UTILITY SERVICE AND THE 150 KVA TRANSFORMER SHOULD BE TIED TOGETHER.

RAY MAJUTA,DSD,ELECTRICAL PLAN CHECK
520-837-4988
Ray.Majuta@tucsonaz.gov
03/12/2008 ROBERT SHERRY WATER REVIEW Denied The provided shell plans do not include water service to the building. Provide approved drawings that show the water service, water meter, and the backflow preventer along with the water calculations. Reference: Section 103.2.3, UPC 2006.
03/12/2008 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Complete the water isometrics; include the pipe sizes. Reference: Section 103.2.3, UPC 2006.
2. Provide a design for mounting the water heater along with structural calculations to show that the water heater is safely supported. Reference: Sections 310.0 and 314.5, UPC 2006.
3. Provide a watertight pan of corrosion-resistant material under the water heater with a drain to an approved location. Reference: Section 508.4, UPC 2006.
4. Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, vacuum relief, and valves. Reference: Sections 103.2.3, 605.5, 608.3, and 608.7 UPC 2006.
03/19/2008 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied Provide information on the sequence of operation for the restroom exhaust to show that recirculation of the air from the restroom will not occur. Reference: Section 403.2.1, IMC 2006.
03/20/2008 GERRY KOZIOL WWM REVIEW Approved