Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T08CM00002
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/24/2008 | SUE REEVES | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
03/25/2008 | DAVE MANN | FIRE | REVIEW | Denied | Please provide a response letter. Please include the following design criteria to the plans. 1. Flow data (static pressure, residual pressure, GPM) Available from the Fire Department (520) 791-3234 2. The hazard classification of the building, including any special hazards. 3. The density required for the hazard. |
03/25/2008 | ROBERT SHERRY | WATER | REVIEW | Denied | A demand flow of 100 GPM through a 2" water meter results in an excessive pressure drop and a velocity greater than the maximum 8 FPS allowed for either plastic or copper piping. In addition, Tucson Water limits the 2" meter to a maximum demand of 80 GPM. Reference: Sections 610.2 and 610.12, UPC 2006. |
04/01/2008 | GERRY KOZIOL | WWM | REVIEW | Approved | |
04/02/2008 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
04/10/2008 | TERRY STEVENS | ZONING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/24/2008 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
04/24/2008 | SHANAE POWELL | REJECT SHELF | Completed |