Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - GRADING ALL
Permit Number - T08BU02111
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/25/2009 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | February 25, 2009 Development Services Department Zoning Review Section Michael St.Paul Planning Technician T08BU02111 Grading Plans for T08CM00906 Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. The grading plan submitted appears to match the approved site plan. Provide the approved site plan with your next submittal. 3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved site plan. Additional comments may be forthcoming. |
| 03/04/2009 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Denied | To: Mardonio Talavera DATE: March 4, 2009 Talavera Engineering and Construction 2455 E. Speedway Blvd. Tucson, Arizona 85719 SUBJECT: Kolb Road Assist. Liv., 3901 S. Kolb Road Site plan T08BU02111 (Third Review) T14S, R15E, Section 32 RESUBMITTAL REQUIRED: Grading Plan and SWPPP The Grading Plan (GP), Drainage Report (DR) and Stormwater Pollution Prevention Plan cannot be approved as submitted. Please address the following review comments prior to the next submittal. Grading Plan: 1. Please include a response letter to the comments along with the corrected copies of the GP. 2. Add note: "Depress all landscaped areas a maximum of 6" for water harvesting" 3. Add the following notes to the grading plan notes: " "The approved Grading Plan is the only acceptable construction plan onsite. The Contractor may not use any other plans, such as the approved Tentative Plat and/or Development Plan, for construction purposes. The Contractor may ask the Development Services Inspector to consult with the other approved plans for additional information or details that might not be included on the approved grading plan but needed for completion of work." " "The contractor shall remove the fine materials from the bottom of the detention/retention basin and scarify the basin bottom once the construction activities are completed in order to remove any fine material build up caused by construction and to restore soil percolation." " "Any engineering work to be done below grade (i.e. toe-downs, cutoff walls, drainage pipes/structures, etc.) shall not be back filled until Development Services Inspector inspects the work and approves it." 4. Please show the proposed roof drainage patterns, 100% of the 10-year flow must be conveyed under the sidewalks including any other site drainage as well.. Sidewalk scuppers are required adjacent to roof down spouts if the drainage is crossing the sidewalk. Per previous comment. 5. Show the activity number (T08BU02111) on all sheets. Drainage report: 1. The DR has been accepted by engineering. SWPPP Plan: SITE MAP: 1. Include site map completed to scale. Part III.C.3. 2. Use arrows to show the direction(s) where stormwater will flow for all areas within the project limits (This is for the period during construction, not final contours. Flow direction may change as project grading progresses; when this occurs, maps are to be updated.). Part III.C.3.a. 3. Show areas of soil disturbance and areas that will not be disturbed. Part III.C.3.b. 4. Show all structural BMP's identified in the SWPPP. Part III.C.3.c. 5. Show locations where stabilization BMP's are expected to occur. Part III.C.3.d. 6. Show locations of on-site material storage, waste storage or receptacles, borrow areas, equipment storage or other supporting activities. Part III.C.3.e. 7. Identify any water bodies (including dry washes and wetlands) on the site. If there are no water bodies, indicate this on the map. Part III.C.3.f. 8. Show locations where stormwater discharges to surface water (including wetlands, ephemeral water and dry washes) and to municipal storm sewer systems (MS4's) (use an "X" to indicate discharge location(s)). Where surface waters and/or MS4's receiving stormwater do not fit on the map, use arrows to show the direction and indicate the approximate distance to the surface water and/or MS4's. Part III.C.3.g. 9. Show the location and registration number of all onsite dry-wells and dry-wells located on adjacent properties that could receive stormwater for the site (if none exist, indicate that). Part III.C.3.h. 10. Identify any areas of the site where final stabilization has been achieved. Part III.C.3.i. 11. Specify existing vegetated areas (trees, brush, ect.) and boundaries of environmentally sensitive areas and buffer zones that are to be preserved. Part III.C.3.j. If you have any questions, I can be reached at 837-4932 or Paul.Machado@tucsonaz.gov Paul P. Machado Senior Engineering Associate City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 837-4932 office (520) 879-8010 fax 3901 S. Kolb Rd._GRAD |
| 12/29/2008 | ANDREW CONNOR | NPPO | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/09/2009 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 03/09/2009 | SUE REEVES | REJECT SHELF | Completed |