Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T08BU02021
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/26/2008 | DAVID RIVERA | ZONING | REVIEW | Denied | 11/26/2008 Development Services Department Zoning Review Section David Rivera Principal Planner Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan at this time. 2. Zoning could not verify that the grading plan was in compliance with the CDRC approved and stamped development plan. Please submit two copies of the CDRC approved and stamped development plan, landscape, and NPPO plans with the next grading plan submittal. Zoning will re-review the grading plan on the next submittal to ensure compliance with the CDRC approved and stamped development plan and landscape/NPPO plans. Additional comments may be forthcoming. 3. Please ensure that the grading plan matches the CDRC approved and stamped development plan. The required development plan with landscape and NPPO plans that must be included with the building and grading plan package must be the most current CDRC approved and stamped set, two copies of each are required. |
| 12/02/2008 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Denied | DATE: December 5, 2008 SUBJECT: Grading Plan TO: a.s.i. architect LOCATION: 1447 E Blacklidge Rd, T13S, R14E, Section 31, Ward 3 REVIEWERS: Bianca Ramirez, CFM ACTIVITY: T08BU02021 (First Review) RESUBMITTAL REQUIRED: Grading Plan SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed grading plan for the above referenced property. Engineering Division does not recommend approval of the grading plan at this time. Please address the following review comments prior to the next submittal. Provide a response letter to the comments along with the corrected copies of the site plan. Grading Plan: 1. Provide copy of drainage report that includes the ckecklist for the basin maintenance per S.M.D.D.F.M. 2.3.1.6 C 1 and 2 to the SP. 2. Proposed roof drainage patterns incicate flow will be discharges across proposed sidewalks, 100% of the 10-year flow must be conveyed under the sidewalks. Please provide supporting scupper calculations to demonstrate compliance with D.S. 3-01.4.4. 3. Add note: A permit or a private improvement agreement will be necessary for any work performed within the Right-of-way. Contact Permits and Codes at (520) 791-5100 for permit information. 4. Cut or fill slopes require a 2' minimum setback from property line. Proposed screen walls are to be offset from property line a minimum of 2' revise all sections to show minimum 2' setback. 5. Drainage patterns are to remain - demonstrate that proposed development maintains current drainage patterns. Proposed design appears to be concentrating flow in post development. Verify that drainage patters are maintained and that design will not cause inverse impact to property receiving concentrated flow. 6. Provide flow arrows, grades and flow rates within and adjacent to site to show drainage scheme and to demonstrate that existing conditions and future conditions match. 7. Provde detail for trash enclosure on grading plan. 8. Grading limits should not include the 2' setback from property line. Please revise accordingly. 9. Call out radius of curbs for enterence to trash enclosure. Show that refuse vehicle can enter and exit with required turning radaii. 10. Provide existing and proposed grades for northeastern propty lines and southeasternly propery lines. Along outer side of sidewalk along northeasternly property line and along southeasternly property line show grades and minimum 2' setback from property lines. 11. For identified spill way provide curb to prevent vehicles from driving into spillway and provide adequate opening to permit the entry of drainage from the site. 12. Detention/Retention: " Match Drainage report. " Must match drainage report. " Inlet/Outlet structural details (Weir design). " Cross-sections and dimension. " Security barriers are required if ponding depth exceeds 2 feet, if slopes are greater than 4:1 and/or if pedestrian access is adjacent to basin. " Water surface elevations. " Peak discharge at basin's outlet. 13. Additional comments may be forthcoming. Drainage report: 1. Please include a response letter to the comments along with the corrected copies of the DR. 2. A Hydrology report is required for parcels affected by 100 year flows of 100 cfs, of more per S.M.D.D.F.M., chap. II, 2.1.2, therefore the drainage study report is not acceptable. 3. The content and format of the Hydrology report should follow S.M.D.D.F.M., chap. II, 2.1.3. 4. Show the project address on the cover of the Hydrology report. 5. Add the basin(s) maintenance responsibility note and checklist per S.M.D.D.F.M. 2.3.1.6 C 1 and 2 to the DR. ee example attachment. 6. Provide compy of the drainage report and geotechnical report with grading submittal for review. 7. Additional comments may be forthcoming. If you have any questions, I can be reached at 837-4928 or Bianca.Ramirez@tucsonaz.gov Bianca C. Ramirez Engineering Associate City of Tucson/Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 837-4928 office (520) 879-8010 fax |
| 12/08/2008 | ANDREW CONNOR | NPPO | REVIEW | Denied | Submit a copy of the approved site and landscape plans for reference. The grading application will be reviewed for compliance only the approved documents are included in the submittal. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/30/2008 | DELMA ROBEY | OUT TO CUSTOMER | Completed |