Permit Review Detail
Review Status: Completed
Review Details: REVISION - GRADING
Permit Number - T08BU02004
Review Name: REVISION - GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/05/2011 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Veterans Plaza T08BU02004 Grading Plan (Revision) TRANSMITTAL DATE: April 5, 2011 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the grading plan was in compliance with the approved development plan. Please submit two copies of the approved, stamped development, landscape, and NPPO plans with the next grading plan submittal. 3. Zoning will re-review the grading plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please call Steve Shields, (520) 837-4956 C:\planning\grading\t07bu01474.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Grading plan and approved development plan and additional requested documents |
04/11/2011 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | April 14, 2011 T07CM01474/T08BU02004 1. The conclusions of the Hydrologic/Hydraulic Report (JAS Engineering, Jeffrey A Stanley, 4-4-11) are accepted. 2. As we have previously discussed, show how the water harvesting basins will be constructed. Provide dimensions on the sections showing the water harvesting areas. The change in grade and labeled slopes seem to result in the available space being used up by slopes and setbacks. 3. Also provide a section along the length of the water harvesting basins along the street frontage to demonstrate that effective water harvesting will be achieved along the whole length of the basins. 4. The sections are labeled with scale notations of ¾" = 1'. The scale doesn't match the drawings. Please provide correct notations. 5. The section callouts on sheet G-01R don't refer to the correct sheets for the details. Provide correct sheet references. Make sure there are callouts for all provided details and make sure the details reflect what is on the plan view. |
04/18/2011 | ANDREW CONNOR | NPPO | REVIEW | Denied | Ensure that all Engineering comments and concerns are addressed prior to Landscape / NPP approval. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/20/2011 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
04/20/2011 | SUE REEVES | REJECT SHELF | Completed |