Permit Review Detail
Review Status: Completed
Review Details: REVISION - GRADING
Permit Number - T08BU02004
Review Name: REVISION - GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/29/2010 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | December 1, 2010 T07CM01474 -Revision T08BU02004- Revision The revision to the plans cannot be accepted as submitted. 1. The revised plan shows the southwesterly basin with a depth of 2.5 feet with side slopes of either 2/1 or 1/2. The basin requires a security barrier. 2. The tops of the basin slopes are shown directly abutting the solid waste enclosure, the screen wall at the property line and the sidewalk at the back of the building. The basin slopes must be at least two feet from any property line and must be set away from the enclosures and curbing to allow adequate space for footings and stability. 3. The site plan doesn't accurately depict the location of water supply lines as they are being installed at the site. The lines are currently installed in the areas depicted as basins. The plan will need to be revised to show the location of these lines and to provide for adequate cover. 4. Show on the plan how the water harvesting areas along the street frontage will be constructed. The adjacent spot grades show that the sidewalk in the right of way is approximately a foot higher than the parking surface. |
12/07/2010 | ANDREW CONNOR | NPPO | REVIEW | Denied | 1. The site plan and landscape plan must show identical site layout to avoid conflict between the two plans. Ensure that all changes to the site plan are reflected on the Grading and landscape plans. 2. Additional comments may apply. |
12/08/2010 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: Lodge on the Desert T07BU01474 Grading Plan (1st Review) TRANSMITTAL DATE: December 8, 2010 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the grading plan was in compliance with the approved development plan. Please submit two copies of the approved, stamped development, landscape, and NPPO plans with the next grading plan submittal. 3. Zoning will re-review the grading plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please call Steve Shields, (520) 837-4956 C:\planning\grading\t07bu01474.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Grading plan and approved development plan and additional requested documents |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/22/2010 | CINDY AGUILAR | APPROVAL SHELF | Completed |
12/22/2010 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |