Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T08BU01844
Review Name: GRADING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/24/2008 | LOREN MAKUS | ENGINEERING | REVIEW | Denied | October 29, 2008 T08BU01844 Grading Plan Review for Tucson Federal Credit Union At Albertson's at El Rio Plaza Lot 4 Reviewed by Loren Makus, EIT The grading plan cannot be approved at this time. Please address the following comments. The SWPPP will be approved when the grading plan is approved. 1. Remove title block elements that identify this as a City of Tucson Project. 2. Provide the correct administrative address for the project. 3. Indicate on the development plan and/or on the grading plan a reference to the recordings for the vacation of the access and utility easements. (Keynote 1) Also show how the no vehicle access easement has been vacated. (Keynote 19) 4. Clarify on the plan where the keynote indicates vertical curb and the section detail indicates an access ramp. 5. Check the keynotes to ensure that they are correct references. For example there is a keynote 14 that indicates the curb ends in the designated loading zone. 6. Check the references in the keynotes. Several notes refer to a non-existing sheet 4. 7. Provide representative spot elevations for the bottom of the water harvesting basins along the south property line. Show how the bottom of the basin will be constructed to allow for effective water harvesting along its whole length by providing intermediate berms or some equivalent method. If you have any questions, please contact me at loren.makus@tucsonaz.gov. |
| 10/31/2008 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | October 30, 2008 Development Services Department Zoning Review Section Michael St.Paul Planning Technician T08BU01844 Grading Plans for D08-0028 Address Comments: 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. In addition, we could not verify that the grading plan was in compliance with the approved development plan for Zoning Review. Please submit two copies of the approved and stamped Development Plan, Landscape, and NPPO plans with the next grading plan submittal. 3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved development plan. Additional comments may be forthcoming. |
| 11/04/2008 | ANDREW CONNOR | NPPO | REVIEW | Denied | Submit a copy of the approved development plan including landscape plans for reference. Ensure that all Engineering comments and concerns are addressed on the grading plan. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 11/07/2008 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 11/07/2008 | SUE REEVES | REJECT SHELF | Completed |