Permit Review Detail
Review Status: Completed
Review Details: SWPPP
Permit Number - T08BU01789
Review Name: SWPPP
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/30/2009 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering and Floodplain Review, 03/30/2009, 1. Owner Certification shall be filled out and signed regardless when construction will start. 2. Show on the SWPPP exhibit the locations of on-site material storage, waste storage or receptacles, borrow areas, equipment storage or other supporting activities (Part III.C.3.e). It is imperative to investigate at this time that there is/are one location or several locations where theses facilities can be located onsite. Once the contractor has been selected, he/she can determine to use these locations or select other locations that are more convenient to the construction activities. 3. Include a copy of the authorization certificate received from ADEQ (Part III.D.2.). 4. Include a copy of the owner's completed and signed NOI form that was submitted to ADEQ (Part III.D.3.). 5. Show on the SWPPP Exhibit the location of the washout area(s) (Part IV.D.7). It is imperative to investigate, at this time, that there is/are one location or several locations where theses washout areas can be located onsite. Once the contractor has been selected, he/she can determine to use these locations or select other locations that are more convenient to the construction activities. 6. The engineer who stamped Figure 2 of the SWPPP shall sign and date his stamp. If you have any questions, I can be reached at 837-4933 or Laith.Alshami@tucsonaz.gov |