Permit Number: T08BU01642
Parcel: 10309071D

Review Status: Active

Review Details: RESUBMITTAL - GRADING ALL

Permit Number - T08BU01642
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
07/23/2009 ANDREW CONNOR NPPO REVIEW Approved
08/06/2009 ELIZABETH LEIBOLD ENGINEERING REVIEW Approved TO: O'Neill Engineering, Tim O'Neill PE
SUBJECT: Grading Plan Engineering Resubmittal Review
PROJECT: Goodmans New Warehouse
LOCATION: 3925 N BUSINESS CENTER DR, Ward 1
FEMA PANEL: 1619K X-shaded (see discussion below)
REVIEWER: Elizabeth Leibold, P.E.
DEPARTMENT: Planning & Development Services Department
ACTIVITY NUMBER: T08BU01642

SUMMARY: The revised Grading Plan package was submitted and reviewed. Development Services Department Engineering Division maintains its recommendation for approval of the Grading Plan. The City of Tucson has recently finished review of the preliminary Digital FIRM maps for panel series L. The proposed floodplain determination from FEMA for this site is being proposed to be changed from X-Shaded to SFHA Zone A. FEMA has stated that the effective date for the new maps is currently scheduled for September 2010. It may be advisable to consider obtaining Zone X flood insurance prior to that date. Please call to discuss. Please also note the department's new name since our merger with the Urban Planning Department.

GRADING PERMIT CONDITIONS:
The following 17 conditions remain and apply for grading permit T08BU01642:
1) Call for DSD Engineering Inspection meetings. For a DSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html
2) A copy of the approved Grading Plans, SWPPP and Permits shall be kept at the site at all times, until final grading approval.
3) For inspection purposes, post the "AZPDES - Posting Requirements" green sheet or NOI at construction entrances to the site at beginning of construction activities and maintain these posted documents throughout project construction.
4) Dust control methods such as water truck will be provided, as well as daily sweeping of the streets.
5) See the associated Stormwater Pollution Prevention Plan as a part of this grading permit. Interim erosion and sediment controls shall be updated, revised, and maintained throughout the life of the project per approved grading plans and SWPPP at disturbance limits. Temporary erosion/stormwater controls may be field adjusted with discussions with operators and engineer of record as necessary within disturbance limits for this project.
6) Grading limits shall provide the required 2-ft offset from north boundary limits.
7) Engineer of Record should be consulted for any revisions to the plans. Proposed revisions to the design must be discussed with a Civil Engineer at the City of Tucson Development Services Department Engineering Division, prior to any construction activity, to determine whether additional details, calculations, drainage report, or a revised grading plan is needed, or, whether changes may be provided on as-builts. All work completed without approval is subject to Stop Work Order.
8) If grading construction is expected to last longer than the expiration date of the grading permit, contact DSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.
9) Call for DSD Engineering special inspection of pump station installation inspection.
10) Contact Permits and Codes (837-6606) for any questions regarding City of Tucson right-of-way permit requirements.
11) Separate building permit applications are required for any walls.
12) All areas that are disturbed due to the construction activity for this project shall be stabilized.
13) Prior to requesting for release for CofO, final Grading Inspection approval by DSD Engineering is required.
14) Prior to request for final grading inspection approval, all permanent erosion control improvements shall be installed and accepted by DSD including rock / established revegetation for all disturbed areas if not improved as per approved plan.
15) The permitee shall notify the DSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all permanent erosion control measures have been completed in accordance with the approved grading plan and grading permit, and all conditions of permit are completed.
16) Prior to request for final inspection approval, any outstanding fees shall be paid.
17) Letters of certification from Engineer of Record for project substantial completion of project, and As-built Grading Plans are required per DS Sec.11-01.16, and shall be submitted prior to final grading inspection. Include as-built FFE for existing and new structure on As-built Final Grading Plan.

If you have any questions, please call me at 837-4934.

Elizabeth Leibold, PE
Civil Engineer
Engineering Division
Planning & Development Services Department
(520)837-4934

Final Status

Task End Date Reviewer's Name Type of Review Description
08/14/2009 SUE REEVES APPROVAL SHELF RECEIVED