Permit Number: T08BU01625
Parcel: 13824022M

Review Status: Completed

Review Details: RESUBMITTAL - GRADING ALL

Permit Number - T08BU01625
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/21/2008 JASON GREEN ENGINEERING REVIEW Denied DATE: October 22, 2008
SUBJECT: Tutor Time (Lot 5) Grading Plan- 2nd Engineering Review
TO: The WLB Group ATTN: Andie Haslem
LOCATION: T15S R13E Sec15, Ward 1
REVIEWERS: Jason Green, CFM
ACTIVITY: T08BU01625 (Grading Plan)


SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed Phase II grading plan (T08BU01561) and referenced Tentative Plat (not stamped approved by CDRC) for the above referenced property. Engineering Division does not recommend approval of the grading plan application at this time. The following items need to be addressed:


GRADING PLAN COMMENTS:

1) Provide a copy of the last stamped approved Tentative Plat (S08-043) and Master Grading Plan (T08BU01561). The Phase II grading plan can not be approved until verification that all details, locations, dimensions, and plan profiles match the approved Tentative Plat and Master Drainage Report. Verify all information associated with the Tentative Plat and Master Drainage Report is shown on this grading plan that will be used as the construction document.

2) Complied.

3) Complied.

4) Complied.

5) Clarify the revision made on this grading plan for the surface drainage on the east side of the subject parcel, Lot 5. Per the Tentative Plat and Master grading plan this area was proposed as a 42-inch screen wall with vents or drains every 10 feet off center, verify that landscaping requirements have been addressed with the removal of the 42-inch screen wall. Provide the approved Landscape Plan for verification.

6) Complied.

7) It is acknowledged that the Master grading plan accounted for all cut and fill quantities that relate to the mass grading and construction of the building pads. However if cut and fill quantities change due to the 'fine' grading of Lot 5 for any required improvements after the mass grading of the entire parcel then a revised grading plan will be required that accounts for any changes to the zero (0) quantities as shown on the Phase II plan.

8) Complied.

9) Revise the Grading Plan to clearly label and dimension all existing underground storm water retention system under the proposed vehicular use area. This comment was not fully addressed. Revise Sheet 2 so that all existing underground systems are labeled. Only the system offsite of the Phase II property has been labeled, revise. Revise Sheet 6 so that all existing underground systems are labeled. Only 2 of the 3 areas have been labeled on Sheet 6, revise.

10) Complied.

11) Revise the Phase II grading plan to clearly label and dimension all proposed roof drains and scuppers. Due to the drainage design revisions from the 1st submittal provide the following corrections on a revised grading plan:

a) Revise Detail #19 to provide the specifications for the proposed filter fabric under the splash pads.
b) Clarify the "Type" of scupper that is being proposed for the roof down spouts. The detail referes to both a Type 1 and Type 2 Standard Detail, clarify which detail is being proposed at these location.
c) Revise either plan view or the detail to provide the scupper lengths as called out in Detail # 19; "Length per Plan." All scupper lengths must be clearly called out on the grading plan for construction purposes.

12) Acknowledged. However due to the revision of these areas on the 2nd submittal of the Phase II grading plan refer to comment #11 above.

13) Revise or clarify on Sheet 2 of the Phase II grading plan the correct call out and locations of the proposed sewer line and Manhole shown at the corner of the building. Verify that all RIM elevations and invert elevations meet the approved Tentative Plat and that all elevations slope towards the downstream end of the pipe. Per the Tentative Plat submitted for this review the sewer line is not in the approved location. However the referenced Tentative Plat is not the last approved plan. Provide the last approved Tentative Plat for verification of conformance with said plan.

14) Complied.

15) Complied.

16) Complied.

17) Complied.

18) Complied.

19) Complied.

20) Complied.

21) Restated. Approval from TDOT Permits and Codes for all improvements within the public right-of-way will be required. A right-of-way use permit application will be required prior to construction. Contact Thad Harvison, (520)-837-6592 or Thad.Harvison@tucsonaz.gov for all right-of-way requirements and permit applications.

22) Restated. Please ensure that any future grading plan will be consistent with the Tentative Plat, Master Grading Plan, Drainage Report and Geotechnical Report. Grading standards may be accessed at: http://www.ci.tucson.az.us/dsd/DevStandsTOC.pdf


STORMWATER POLLUTION PREVENTION PLAN: It is acknowledged that the Master SWPPP approved under the Master Grading Plan (T08BU01561) covers the entire site and a new SWPPP review is not required. Verify that all changes in the field are updated on the Master SWPPP and exhibits for conformance with ADEQ. Restated.


GENERAL COMMENTS:

Provide a revised Phase II grading plan, last approved Tentative Plat, Landscape Plan and Master Grading Plan that addresses the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments. Enclose "redlines" with the re-submittal package.

Further comments may be generated upon re-submittal of the grading plan review.

If you have any questions or to schedule an appointment call me at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
COT Development Services
10/23/2008 MICHAEL ST. PAUL ZONING REVIEW Denied October 23, 2008

Development Services Department
Zoning Review Section

Michael St.Paul
Planning Technician

T08BU01625 Grading Plans for S08-043

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the grading plan was in compliance with the approved tentative plat. Please submit one copy of the CDRC approved and stamped tentative plat, landscape, and NPPO plans with the next grading plan submittal.

3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the CDRC approved and stamped tentative plat. Additional comments may be forthcoming.
10/31/2008 ANDREW CONNOR NPPO REVIEW Denied Submit a copy of the approved development plan including landscape and native plant preservation plans for reference. The grading application will be reviewed for compliance when the approved documents are included in the submittal.

Final Status

Task End Date Reviewer's Name Type of Review Description
11/19/2008 CINDY AGUILAR OUT TO CUSTOMER Completed
11/19/2008 SUE REEVES REJECT SHELF Completed