Permit Review Detail
Review Status: Completed
Review Details: GRADING
Permit Number - T08BU01140
Review Name: GRADING
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/01/2008 | DAVID RIVERA | ZONING | REVIEW | Denied | Development Services Department Zoning Review Section 07/01/2008 David Rivera Principal Planner Comments: 1. The grading plan has been reviewed by Zoning Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the grading plan was in compliance with the approved site plan. Please submit two copies of the DSD approved and stamped site, landscape, and NPPO plans with the next grading plan submittal. 3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved and stamped site plan. Additional comments may be forthcoming. |
07/09/2008 | ANDREW CONNOR | NPPO | REVIEW | Denied | Site plan approval is necessary to continue review. |
07/22/2008 | JASON GREEN | ENGINEERING | REVIEW | Denied | DATE: July 23, 2008 SUBJECT: Saguaro Vista Shopping Center- Grading Plan Review TO: Olsson Associates Attn: Edudado Gonzales LOCATION: 7760 E Speedway Blvd, T14S R15E Sec08, Ward 2 REVIEWERS: Jason Green, CFM ACTIVITY: T08BU01140 (Grading Plan) SUMMARY: Engineering Division of Development Services Department has received and reviewed the grading plan (T08BU01140) and Drainage Statement (Olsson Associates, 28JAN08) for the above referenced property. Engineering Division does not recommend approval of the grading plan application at this time. The following items need to be addressed: GRADING PLAN COMMENTS: 1) Provide a copy of the last approved site plan (T08CM00405). The grading plan can not be approved until verification that all details, locations, dimensions, and plan profiles match the approved site plan. Provide a copy of the stamped approved site plan within the grading plan package. All items on the grading plan must match the site plan plus provide additional construction information on the grading plan sheets for construction purposes. 2) Revise the grading plan Paving Note # 7 to include verbiage that "All roof down spout locations must be designed to convey the 10-year flow under the pedestrian circulation." 3) Revise the grading plan to clearly label the proposed pedestrian circulation path from the proposed building to the refuse enclosure. 4) Provide a cross access agreement and approval from the adjacent property owners for the construction of the refuse container and vehicular use area that is to be constructed off of the original site. All improvements that are to be constructed outside of the subject property boundaries will require approval from adjacent property owners and will require a cross access agreement for the collection of solid waste. 5) Refer to comments from Ron Brown, RA Structural Plans Examiner for all handicap and ANSI Standard requirements that apply to this project. 6) DS Sec.11-01.4.1.3: Revise the grading plan to provide a General Note that includes the square footage of the entire subject parcel(s) and the square footage of the proposed disturbed area. 7) DS Sec.11-01: Provide a general grading note, including a grading/drainage note specifying conformance with City of Tucson Development Standard 11-01.0 (excavation and grading requirements). 8) Provide a general note on the grading plan to state the following: "Call for a Pre-construction meeting prior to start of earthwork. To schedule a DSD Pre-construction meeting, SWPPP inspection or general Engineering Inspections, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 791-5550 extension 2101, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 9) Approval from TDOT Permits and Codes for all improvements within the public right-of-way will be required. A right-of-way use permit application will be required prior to construction, if applicable. Contact Thad Harvison, (520)-837-6592 or Thad.Harvison@tucsonaz.gov for all right-of-way requirements and permit applications. 10) Please ensure that the proposed grading plan is consistent with the site plan and Drainage Statement with Addendums. Grading standards may be accessed at: http://www.ci.tucson.az.us/dsd/DevStandsTOC.pdf GENERAL COMMENTS: Please provide the last approved site plan, 2 copies of the revised grading plan and 2 copies of the Drainage Statement that addresses the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments. Enclose "redlines" with the resubmittal package. Further comments may be generated upon resubmittal of the grading plan review. If you have any questions or to schedule an appointment call me at 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division COT Development Services |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/14/2008 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
08/14/2008 | SUE REEVES | REJECT SHELF | Completed |