Permit Number: T08BU00919
Parcel: 99999999A

Address:
9955 E 22ND ST

Review Status: Completed

Review Details: GRADING

Permit Number - T08BU00919
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/27/2008 DAVID RIVERA ZONING REVIEW Denied 05/27/2008

Development Services Department
Zoning Review Section

David Rivera
Principal Planner

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan at this time.

2. While zoning acknowledges that the grading plan is in substantial zoning compliance as it relates to the Zoning review purview, with the CDRC approved and stamped tentative plat, the grading plan cannot be approved at this time.

3. Please ensure that the grading plan matches the CDRC approved and stamped tentative plat. Zoning will re-review the grading plan on the next submittal to ensure compliance with the CDRC approved and stamped TP. Additional comments could be forthcoming.

4. The access ramp to the detention basin that is drawn on the tentative plat has not been depicted on the grading plan. Please contact the DSD Engineering plans reviewer for requirements for the ramp.
05/29/2008 ANDREW CONNOR NPPO REVIEW Denied Submit a copy of the approved landscape and native plant preservation plans for reference. The grading application will be reviewed for compliance when the approved documents are included in the submittal.
06/25/2008 LOREN MAKUS ENGINEERING REVIEW Denied T08BU00919
Red Colt Ranch Grading Plan

The grading permit cannot be approved as submitted. Please revise the Grading Plan and SWPPP. Include a response letter that completely describes the revisions made to address each comment.

1. Revise the notation for the 22nd Street right-of-way. The 75-foot half right-of-way was dedicated by the plat. Remove the notation that it is proposed.
2. Remove the potential future curb and sidewalk locations. The grading plan should reflect the project as it is to be constructed at this time.
3. The rezoning conditions include a requirement for a sediment trap for the inlet to the basin. Show details for the sediment trap that meet the requirements of the rezoning conditions.
4. Clarify the references for the details in the construction notes. The notes refer to Sheet C-2. Provide a sheet labeled C-2
5. Construction note 2 indicates that a new drainage channel is to be constructed. The location of the note near the southeast corner of the basin points to a feature that the tentative plat indicates should be a concrete bench on a concrete slab. Clarify the notes and plan.
6. Clearly indicate on the plan the location of the drainage channel shown in the detail on grading plan sheet TP-2. Provide construction details for the entrance structure for the channel. Show how water will be directed into the channel.
7. Provide an engineering evaluation of the use of the existing CMU wall as part of the retention detention basin containment. It appears that the water may rise nearly 2 feet up the wall.
8. Since the wall is part of Sunset Cove Subdivision, provide evidence that you have received permission from the owners in Sunset Cove for the use of their wall. Also provide evidence that you have received permission from Sunset Cove for use of their property for part of the drainage system for this development.

SWPPP
9. Page 3 of the SWPPP indicates that the site is 14.7 acres. Revise the SWPPP.
10. List the percentage of the site that is impervious before the project begins and the percentage that will be impervious once the project is complete. (Part III.C.2.d)
11. Provide a description of the soil and its potential for erosion. (Part III.C.2.e)
12. Revise the location map to show the receiving water and all washes within one mile of the site. (Part III.C.4)
13. Page 4 of the SWPPP lists the erosion and sediment controls that are expected to be used on the site. Show the locations of all structural controls on the site map. Note that silt fence is not listed on page 4 but is shown extensively on the site map. Revise the SWPPP to be consistent.
14. Show on the site map where the stormwater discharges to a surface water. Show where the discharge that exits through the culvert under Bonanza Avenue daylights and describe how the discharge location will be inspected.
15. Indicate in the SWPPP that there are no drywells that are likely to receive discharge from this site.
16. Include a copy of the general permit in the SWPPP.

If you have any questions or wish to set up a meeting I can be contacted at loren.makus@tucsonaz.gov

Loren Makus
Senior Engineering Associate

Final Status

Task End Date Reviewer's Name Type of Review Description
07/07/2008 BETH GRANT OUT TO CUSTOMER Completed
07/07/2008 SUE REEVES REJECT SHELF Completed