Permit Number: T08BU00493
Parcel: 99999999A

Review Status: Completed

Review Details: GRADING

Permit Number - T08BU00493
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/01/2008 ANDREW CONNOR NPPO REVIEW Denied 1. Submit a copy of the approved development plan including landscape and native plant preservation plans for reference. The grading application will be reviewed for compliance when the approved documents are included in the submittal. Revise grading plans as necessary to comply with the approved plans

2. Condition associated with Case # D06-0013: No grading permits will be issued until the easement agreement is executed and recorded. Send a copy of the recorded easement agreement (SCREA OR SIMILAR) to the Landscape Section for review prior to or in conjunction with applications for permits.
04/15/2008 MICHAEL ST. PAUL ZONING REVIEW Denied April 15, 2008

Development Services Department
Zoning Review Section

Michael St.Paul
Planning Technician

T08BU00493 (Phase 1A) Grading Plans for D06-0013
9044 South Houghton Road

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. In addition, we could not verify that the grading plan was in compliance with the approved development plan for Zoning Review. Please submit two copies of the approved and stamped Development Plan, Landscape, and NPPO plans with the next grading plan submittal.

3. The grading plan submitted does not match the scope of work demonstrated as Phase 1A on the Development Plan.

4. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved development plan. Additional comments may be forthcoming.
05/23/2008 PAUL MACHADO ENGINEERING REVIEW Denied To: Bruce Paton, P.E. DATE: May 29, 2008
Rick Engineering Company,Inc.
1745 E. River Rd., Ste. 101
Tucson, Arizona 85718
SUBJECT: Houghton Town Center, Phase I
Grading Plan T08BU00493 (First Review)
T15S, R15E, Section 26 and 35

RESUBMITTAL REQUIRED: Grading Plan, Drainage Report and SWPPP

The Grading Plan (GP), Drainage Report (DR) and Stormwater Pollution Prevention Plan cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Grading Plan:
1. Please include a response letter to the comments along with the corrected copies of the GP.
2. As per the Federal ADA requirements, all wheel chair ramps shall have the truncated domes instead of the standard grooves that are shown on COT SD 207. Aside from the Truncated Domes, all wheel chair ramps shall be constructed in accordance with COT SD 207.
3. Add to grading notes: "An existing, underground natural gas pipeline is located within a utility easement traversing the entire development".
4. Add to grading notes: "All grading shall conform to the City of Tucson Development Standards Chapter 11-01.0 Excavation and Grading".
5. Add the following notes to the grading plan notes:
" "The approved Grading Plan is the only acceptable construction plan onsite. The Contractor may not use any other plans, such as the approved Tentative Plat and/or Development Plan, for construction purposes. The Contractor may ask the Development Services Inspector to consult with the other approved plans for additional information or details that might not be included on the approved grading plan but needed for completion of work."

" "The contractor shall remove the fine materials from the bottom of the detention/retention basin and scarify the basin bottom once the construction activities are completed in order to remove any fine material build up caused by construction and to restore soil percolation."

" "Any engineering work to be done below grade (i.e. toe-downs, cutoff walls, drainage pipes/structures, etc.) shall not be back filled until Development Services Inspector inspects the work and approves it."

6. Remove the reference to the type 2 on sheet no. 1. Type 2 grading permits are issued by Pima County, not the City of Tucson.
7. List the GP activity no. (T08BU00493) on all sheets.
8. Grading in excess of 35 acres will require additional grading permits. A Development Standard Modification Request (DSMR) can be applied for to satisfy this comment.
9. Show Phase numbers and clearly delineate the phases on the plans. Each phase must function independent of future phases.
10. Clearly depict grading limits on the plans.
11. Both the retention/detention basins require maintenance access ramps. Revise as required.
12. Show bollards where the street terminates at the intersections.
13. A permit or a private improvement agreement will be necessary for any work performed within the Right-of-way. Contact Permits and Codes at (520) 791-5100 for permit information.
14. Delineate 100-year W.S.E.L., Floodplain and erosion hazard setback.
15. Show top of banks (20 ft. maintenance easement - 50 ft. study area).
16. Show the 100-year flood peak discharge.
17. Slopes of 3H: 1V require hand placed riprap.
18. Slopes of 2H: 1V or greater require grouted riprap.
19. Cut or fill slopes require a 2' minimum setback from property line.
20. Placement of fill in excess of 2' above existing grade at any location in the outer 100' of the developing site is not allowed and/or shall meet the requirements per D.S. 11-01. Please address.
21. Provide a set of plans for the Houghton Improvements per the RTA by Castro Engineering, if you are unable to do so please contact me so that I may intercede. Design considerations shall be acknowledged when the changed of design of the 2 cmp's currently crossing Houghton road. The improvements on Houghton Road shall be shown on the plans also.
22. Flow arrows, grades and flow rates within and adjacent to site to show drainage scheme.
23. Call out peak discharges entering and exiting the site.
24. Detention/Retention:
" Match Drainage report.
" Must match drainage report.
" Inlet/Outlet structural details (Weir design).
" Cross-sections and dimension.
" Dimension basin and provide spot elevations.
" Security barriers are required if ponding depth exceeds 2 feet, if slopes are greater than 4:1 and/or if pedestrian access is adjacent to basin.
" Water surface elevations.
" Peak discharge at basin's outlet.

Drainage report:
1. Please include a response letter to the comments along with the corrected copies of the DR.
2. The DR has been accepted by engineering.
3. Add the basin(s) maintenance responsibility note and checklist per S.M.D.D.F.M. 2.3.1.6 C 1 and 2 to the DR.

Stormwater pollution prevention plan:

1. Describe the project and its intended use after the NOT is filed (e.g. low density residential, shopping mall,
Structural Practices:

2. Provide adequate sediment basins. (Part IV.D.5.a.).
a. For common drainage locations that serve an area with 10 or more acres disturbed at one time, a temporary (or permanent) sediment basin that provides storage for a calculated volume of runoff from a 2 year, 24 hour storm from each disturbed acre drained, must be provided where attainable until final stabilization of the site. Where no calculation has been performed, a temporary (or permanent) sediment basin providing 3,600 cubic feet of storage per acre drained, shall be provided where attainable until final stabilization of the site. When computing the number of acres draining into a common location it is not necessary to include flows from offsite areas and flows from onsite areas that are either undisturbed or have undergone final stabilization where such flows are diverted around both the disturbed area and the sediment basin. In determining whether installing a sediment basin is attainable, the operator may consider factors such as site soils, slope, available area on site, etc. If "non-attainability" is claimed, then an explanation of that non-attainability shall be included in the SWPPP. In any event, the operator must consider public safety, especially as it relates to children, as a design factor for the sediment basin and alternative sediment controls must be used where site limitations preclude a safe design.
b. For drainage locations that serve 10 or more disturbed acres at one time and where a sediment basin meeting the provision of Part IV D.5.a.1 is not attainable, smaller sediment basins and/or sediment traps shall be used. Where a sediment basin is not attainable, silt fences, vegetative buffer strips, or alternatives which achieve effective sediment control are required for all down slope boundaries of the construction area (and for those side slope boundaries deemed appropriate as dictated by individual site conditions).
c. For drainage locations serving less than 10 acres, smaller sediment basins and/or sediment traps shall be used. Silt fences, vegetative buffer strips, or equivalent sediment controls are required for all down slope boundaries (and for those side slope boundaries deemed appropriate as dictated by individual site conditions) of the construction area unless a sediment basin providing storage for a calculated volume of runoff from a 2 year, 24 hour storm or 3,600 cubic feet of storage per acre drained is provided.
3. Place velocity dissipation devices at discharge locations and along the length of any outfall channel to provide a non-erosive flow velocity from the structure to a water course so that the natural physical and biological characteristics and functions are maintained and protected (e.g. no significant changes in the hydrological regime of the receiving water). (Part IV.D.5.b).
Note: The velocity dissipation devices must be in place during the construction phases. Installation scheduling must be included and should be as early as practicable.
4. Replace the old ADEQ general permit with a copy of the new ADEQ general permits in the SWPPP plan.
5. Amend the SWPPP plan to include the requirements applicable to the SWPPP plan.
New SWPPP requirements.
OPERATOR RESPONSIBILITIES:
1. Identify who is responsible for on-site SWPPP implementation. Part III.A.2.d.
2. Indicate or show the areas of the project where the operator has control over project specifications, including the ability to make changes in the specifications. Part III.B.2.a.
3. Provide name(s) of the person(s) who have day-to-day control over construction plans and specifications. Part III.B.2.a.
4. Identity who is responsible for installing, implementing, and maintaining the BMP's in the plan. Part III.B.2.b.
5. Identify or show the areas of the project where each operator has control over day-to-day activities. Part III.B.2.b.
6. Provide name(s) of the person(s) having control over project specifications, including the ability to make changes in the specifications. Part III.B.2.b.
7. Provide the name and contact information for all operators and indicate the areas of the project each operator controls. Part III.C.1.
PROJECT DESCRIPTION:
8. Identify all potential sources of pollutants/pollution from construction activities that could possibly contact stormwater. Part III.A.2.a.
9. Describe the construction activity (what is being built, what is being disturbed, how long it is expected to take, etc.). Part III.C.2.
10. Describe the project and what it will be used for when completed (after Notice of Termination (NOT) is filed). Part III.C.2.a.
11. Describe the planned phasing sequencing of land disturbance activities. The amount of open/disturbed dirt left open at one time should be minimized where possible. Part III.C.2.b.
12. Indicate the total acres of the site and the number of acres that will be disturbed (include off-site borrow and fill area, staging and equipment storage areas). Part III.C.2.c.
13. Indicate the percentage of the site that is impervious (e.g., pave, roofed , etc.) before and after construction. Part III.C.2.d.
14. Describe the soil (e.g., sand, clay, etc.) at the site and its potential for erosion (Suggestion: reference the soil survey covering the project site prepared by the U.S. Department of Agriculture, Natural Resource Conservation Service for soil information http://soils.usda.gov/survey/). Part III.C.2.e.
15. Include a map showing the project location (e.g., U.S.G.S. quadrangle, portion of a city or county map). The map must also show any washes of other waterbodies within 1 mile of the site. Part III.C.2.f.
16. Identity the nearest receiving water(s). A receiving water is a natural watercourse into which stormwater would flow in a storm event and includes dry washes, streams, tributaries, and other water of the U.S. (such as designated canals). Man made structures such as retention basins, storm sewer systems, or city storm drains are not receiving waters. Part III.C.4.
17. Identify the areal extent where soils may be disturbed and show any wetlands near the site that could receive dirt or run-off from the construction activity. Part III.C.4.
18. Describe any pollutant sources from areas other than dirt moving (e.g., dedicated concrete and asphalt plants, fueling operations, material or waste storage etc. that are associated with the construction project). Identify where these sources are or will occur on the site. Part III.C.6.
SITE MAP:
19. Include site map completed to scale. Part III.C.3.
20. Use arrows to show the direction(s) where stormwater will flow for all areas within the project limits (This is for the period during construction, not final contours. Flow direction may change as project grading progresses; when this occurs, maps are to be updated.). Part III.C.3.a.
21. Show areas of soil disturbance and areas that will not be disturbed. Part III.C.3.b.
22. Show all structural BMP's identified in the SWPPP. Part III.C.3.c.
23. Show locations where stabilization BMP's are expected to occur. Part III.C.3.d.
24. Show locations of on-site material storage, waste storage or receptacles, borrow areas, equipment storage or other supporting activities. Part III.C.3.e.
25. Identify any water bodies (including dry washes and wetlands) on the site. If there are no water bodies, indicate this on the map. Part III.C.3.f.
26. Show locations where stormwater discharges to surface water (including wetlands, ephemeral water and dry washes) and to municipal storm sewer systems (MS4's) (use an "X" to indicate discharge location(s)). Where surface waters and/or MS4's receiving stormwater do not fit on the map, use arrows to show the direction and indicate the approximate distance to the surface water and/or MS4's. Part III.C.3.g.
27. Show the location and registration number of all onsite dry-wells and dry-wells located on adjacent properties that could receive stormwater for the site (if none exist, indicate that). Part III.C.3.h.
28. Identify any areas of the site where final stabilization has been achieved. Part III.C.3.i.
29. Specify existing vegetated areas (trees, brush, ect.) and boundaries of environmentally sensitive areas and buffer zones that are to be preserved. Part III.C.3.j.
BEST MANAGEMENT PRACTICES (BMPs):
30. Identify BMP's selected for the site and describe how each will reduce pollutants in stormwater. Part III.A.2.b, Part III.C.5.a and Part IV.A.1.
31. Describe how BMP's will be added, modified, or replaced for each phase or sequence of construction activities. Also identify which operator is responsible for the implementation of BMP's. Part III.C.5.b.
32. Provide drawings and/or specifications of structural BMP's that include design or installation details. Part III.C.5.c.
33. Describe where natural/existing vegetation will be preserved. Locations of trees and boundaries of environmentally sensitive areas and buffer zones to be preserved are also to be on the SWPPP site map. Part IV.B.1.a.
34. If using seed to revegetate, provide the mixture and application specifications. (These may be obtained from product provider. Part IV.B.1.b.
35. If culverts are present on-site, describe measures that will be used to minimize erosion at and around the culvert(s). Part IV.B.1.c.
36. Describe how off site stormwater that may run onto the project site will be diverted or otherwise managed with on-site engineering controls, containment, or BMP's. Part IV.B.1.d.
37. Identify how records of when construction activities temporarily or permanently cease on all portion of the site will be kept. Part IV.B.3.a.
38. Identify how records of when construction activities temporarily or permanently on all portions of the site will be kept. Part IV.B.3.b.
39. Identify how records of when stabilization measures are initiated and completed and reason(s) for delay will be kept. Part IV.B.3.c.
40. Provide sizing criteria and show calculations for sediment basin(s) and indicate whether basin(s) will be temporary or permanent (i.e., post-construction). Part IV.C.3.
41. Provide reason(s) or rationale why a sediment basin was determined to not be possible at the project site (If applicable). Part IV.C.3.
42. Describe the location(s) and how materials will be stored or staged both on-site and off-site; including overburden, soil stockpiles, and borrow areas. Part IV.D.3.
43. Indentify and provide the location(s) of all non-stormwater discharges allowed by this permit expected to be associated with the project and describe BMP's used to minimize discharge of pollutants. Part IV.E.2.
44. Describe measures for preventing and responding to spills, including spill notification requirements. Part VI.B.1.
POST-CONSTRUCTION CONTROLS:
45. Identify post-construction stormwater BMP's (e.g., porous pavement, open space preservation, etc.) that will be installed as part of this project. NOTE: Temporary BMP's (e.g., straw waddles, etc.) must be removed prior to submitting your Notice of Termination (NOT). Part IV.F.1.
INSPECTIONS:
46. Identify the minimum inspection frequency as well as goals for more frequent inspections. Part IV.H.1.
47. Provide name, title and qualifications of person(s) who will be conducting inspections. Part IV.H.1.
48. Describe how inspection of the following items will be conducted (Part IV.H.3.a.):
" Good housekeeping BMP's (e.g., solid waste storage and pick-up; chemical storage, use, and cleanup; fueling, etc.).
" Erosion and sediment control BMP's.
" Construction site entrance and egress locations(s) including looking for evidence of sediment, debris, and other pollutants tacked offsite onto paved surfaces (e.g., streets, sidewalks, parking lots, etc.).
" Municipal storm sewer systems, including streets, inlets, etc. which can be observed at ground level. Should focus on discharge (and potential for discharge) and accumulation of sediment, trash, and other pollutants.
" Observation and assessment of accessible discharge locations to determine of erosion control BMP's are adequate and effective in reducing discharge of sediments.
" For discharge points that are inaccessible, inspection of downstream locations should occur, where practicable.
49. Describe how inspections will be documented (NOTE: inspection reports must be added to the SWPPP in chronological order, Permit Part IV.H.4). Part IV.H.3.b.
50. Describe procedures for repairing, replacing, and/or supplementing nonfunctional and underperforming BMP's (see Permit Part IV.I.2). Part IV.H.3.c.
INSPECTION REPORT:
51. Provide a copy of the inspection report form to be used to document site inspections. At a minimum, the report form must include the information (NOTE: an example form is included with the review comments). Part IV.H.4.
MONITORING PLAN:
52. If discharging to impaired water, identify sources of pollutants of concern listed on the 303(d) list that may be potentially discharged through construction project or site is being operated in compliance with the SWPPP and permit. Part III.C.6.
53. For projects located within ΒΌ- mile of unique or impaired water, your SWPPP must include a Monitoring Plan. Part V.B.1.
54. If the unique or impaired water is a lake, your monitoring plan (including monitoring locations) must be submitted to and approved by the department. Part V.D.3.
55. Chain-of-custody (COC) forms including: sampler's name, phone number, date and time of sample collection, sample identification, requested analysis, and project name or number. Part V.D.5.
ADMINISTRATIVE:
56. Ensure the SWPPP is signed be an arson meeting the certification requirements of Permit Part VIII.J. Part III.A.3, Part VIII.J.2.
57. Include a copy of AZPDES permit (AZG2008-001) with the SWPPP. Part III.D.1.
58. Include a copy of the completed NOI form that was submitted to ADEQ. Part III.D.2.
59. Include a copy of the authorization certificate received from ADEQ. Part III.D.3.
60. Identify any city or county which received a copy of the authorization certificate. Part III.D.4.
61. Include copies of the other agreements with any state, local or federal agencies that would affect the provisions of implementation of the SWPPP, if applicable (404 permits, local grading permits, etc.). Part III.C.5.

If you have any questions, I can be reached at 837-4932 or Paul.Machado@tucsonaz.gov
Paul P. Machado
Senior Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4932 office
(520) 879-8010 fax
C:/9044 S. Houghton Rd_GRAD

Final Status

Task End Date Reviewer's Name Type of Review Description
06/02/2008 CINDY AGUILAR OUT TO CUSTOMER Completed
06/02/2008 GERARDO BONILLA REJECT SHELF Completed