Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T08BU00439
Parcel: 13316024N

Address:
6450 E GRANT RD

Review Status: Completed

Review Details: RESUBMITTAL - GRADING ALL

Permit Number - T08BU00439
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/10/2008 ANDREW CONNOR NPPO REVIEW Approved
09/10/2008 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Grant Wilmot Retail
T08BU00439
Grading Plan (4th Review)

TRANSMITTAL DATE: September 10, 2008

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the grading plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next grading plan submittal.

3. Zoning will re-review the grading plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C:\planning\grading\t08bu00439

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Approved site plans and additional requested documents
09/19/2008 JASON GREEN ENGINEERING REVIEW Denied DATE: September 19, 2008
SUBJECT: 6450 E Grant Road- 4th Engineering Review
TO: Rick Engineering Company
LOCATION: T14S R15E Sec06, Ward 2
REVIEWERS: Jason Green, CFM
ACTIVITY: T08CM00751 (Site Plan) and T08BU00439 (Grading Plan)


SUMMARY: Engineering Division of Development Services Department has received and reviewed the revised site plan (T08CM00751), grading plan (T08BU00439), Drainage Report (Rick Engineering Company, 03MAR08, revised 09MAY08 and 06AUG08) and Geotechnical Evaluation (Western Technologies Inc., 02FEB05 addendum 24APR08 and 19MAY08) for the above referenced property. Engineering Division recommends conditional approval of the site plan at this time. The grading plan application is still denied at this time until the stamped approved site plan is submitted for review. The Drainage Report was reviewed for site plan and grading plan purposes only.


SITE PLAN COMMENTS:

New Comment: Engineering acknowledges the approved Design Development Option (DDO). Once all review comments from all DSD agencies have been addressed the site plan will need to be stamped by the DDO section, Frank Podgorski, prior to final approval by Engineering.

1) Complied.

2) Complied.

3) Complied.

4) Complied.

5) Complied.

6) Complied.

7) Complied.

8) Acknowledged.

9) Acknowledged.


GRADING PLAN COMMENTS: The project was reviewed for grading plan purposes, however until the DDO and DSD stamped approved site plan is submitted the grading plan could not be shown to be in conformance with an approved plan. The grading plan will be stamped approved once the approved site plan has been submitted.

10) Complied.

11) Complied.

12) Complied.

13) Complied.

14) Complied.

15) Complied.

16) Complied.

17) Complied.

18) Complied.

19) Complied.

20) Complied.

21) Complied.

22) Complied.


DRAINAGE REPORT:

23) Acknowledged. Due to the Geotechnical Report and the infiltration test provided (shows a drain down time greater than the allowed 12 hours) it will be required that prior to the final grading inspection the basin be scarified and all excess sediment removed so that the basin still has an optimal drain down time (This should take place prior to installation of the required landscaping).

24) Complied.

25) Complied.

26) Complied.


GEOTECHNICAL EVALUATION:

27) Complied.


GENERAL COMMENTS:

Please provide the DDO approved site plan and grading plan that address the comments provided above. For expedite purposes the site plan can be reviewed over the counter (DSD Engineering Division comment only) for stamp approval once all items have been addressed. The revised grading plan must be reviewed in house in order to digitize the revised plan and get it to our Records Department.

If you have any questions or to schedule an appointment I can be reached at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
COT Development Services