Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - GRADING ALL
Permit Number - T08BU00384
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/19/2008 | ANDREW CONNOR | NPPO | REVIEW | Approv-Cond | |
| 05/19/2008 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: SE Corner of Sears Blvd. & Ganley Rd. T08BU00384 Grading Plan (1st Review) TRANSMITTAL DATE: May 19, 2008 1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the grading plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next grading plan submittal. 3. Zoning will re-review the grading plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\grading\t08bu00384 RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Approved site plans and additional requested documents |
| 06/17/2008 | JASON GREEN | ENGINEERING | REVIEW | Approved | DATE: June 17, 2008 SUBJECT: Family Dwelling "RCP-6"- 2nd Engineering Review TO: Rick Engineering- Attn: Dan Castro LOCATION: 6219 S Sears Blvd, T15S R14E Sec08 Ward 5 REVIEWERS: Jason Green, CFM ACTIVITY: T08BU00384 (Grading Plan) SUMMARY: Engineering Division of Development Services Department has received the revised grading plan, Drainage Report (Rick Engineering Company, 21DEC07), Geotechnical Investigation Report (Foree & Vann, Inc., 06NOV06) and Stormwater Pollution Prevention Plan (Rick Engineering Company, 27FEB08 revised 06MAY08). Engineering Division has reviewed the submitted grading plan, Drainage Report, Geotechnical Investigation and Stormwater Pollution Prevention Plan (SWPPP) and recommends approval at this time. " Call for a Pre-construction meeting prior to start of earthwork. To schedule a DSD Pre-construction meeting, SWPPP inspection or general Engineering Inspections, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 791-5550 extension 2101, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html " Review and approval from TDOT Permits and Codes for all improvements within the public right-of-way will be required. A right-of-way use permit application will be required prior to construction. Refer to the following links for TDOT Forms and applications: a) http://www.tucsonaz.gov/dsd/Forms_Fees___Maps/Applications/applications.html / b) http://www.dot.ci.tucson.az.us/engineering/pia.php c) Or contact Thad Harvison at 837-6592 for all additional questions regarding r-o-w. If you have any questions I can be reached at 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division Development Services |