Permit Number: T08BU00373
Parcel: 136290020

Review Status: Completed

Review Details: REVISION - GRADING

Permit Number - T08BU00373
Review Name: REVISION - GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/14/2009 PAUL MACHADO ENGINEERING REVIEW Denied To: Ken Perry, P.E. DATE: October 14, 2009
4625 E. Fort Lowell Road
1745 E. River Road, Suite 101
Tucson, Arizona 85712
SUBJECT: Santa Rita High School, 3951 S. Pantano Rd
Grading Plan "As-Builts" T08BU00373(1st Review)
T14S, R15E, Section 33

RESUBMITTAL REQUIRED: Grading Plan and Drainage Statement.

The closure documentation / as-built package including the Grading Plan (GP) and Drainage Statement (DS) cannot be approved as submitted. A field visit was performed on October 2, 2009. Please address the following review comments prior to the next submittal.

Grading Plan:

1. Please include a response letter to the comments along with the corrected copies of the GP.
2. It appears that in the area adjacent to the East side of the Gym at the northern most roof drain has been ponding. The rip-rap/spillway for the northern most roof drain shall be re-graded to achieve positive flow and to alleviate the ponding in that area.
3. The dirt area in between the East side of the Gym and the playground appears to have had a swale accepting stormwater from the North portion of the property. This portion of the swale shall be re-graded to insure positive flow.
4. There is evidence of stormwater pollution (silt) on the asphalt driveway south of the gym. The construction areas (dirt areas) east and south of the new gym shall be stabilized to minimize the stormwater pollution.
5. List administrative address/site address on plans.
6. List Site (T08CM00170) and Grading plan (T08BU00373) number on the plans.


Drainage Statement:
1. Please include a response letter to the comments along with the corrected copies of the DS.
2. A Drainage Statement is a brief description of drainage conditions applicable for a site which are not affected by 100 year flows of 100 cfs, of more……per S.M.D.D.F.M., chap. II, 2.1.2. The DS must be submitted along with the as-built package resubmittal.
3. The content and format of the Drainage Statement should follow S.M.D.D.F.M., chap. II, 2.2.
4. Show the project address or administration address on the cover sheet of the DS.

If you have any questions, I can be reached at 837-4932 or Paul.Machado@tucsonaz.gov
Paul P. Machado
Senior Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4932 office
(520) 879-8010 fax
C:/3951 S. Pantano Rd Grad

Final Status

Task End Date Reviewer's Name Type of Review Description
04/08/2010 CPIERCE1 OUT TO CUSTOMER Completed