Permit Number: T08BU00251
Parcel: 13423424B

Address:
251 S WILMOT RD

Review Status: Completed

Review Details: RESUBMITTAL - GRADING ALL

Permit Number - T08BU00251
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/29/2008 ANDREW CONNOR NPPO REVIEW Approved
05/07/2008 BIANCA RAMIREZ ENGINEERING REVIEW Denied To: Corporex Select Service Hotels. DATE: May 7, 2008
Mark Bischoff FROM: Bianca Ramirez, CFM
251 S Wilmot Engineering Division
Tucson, Arizona 85719

SUBJECT: Hampton Inn
Grading Plan T08BU00251 (Second Review)
T14S, R14E, Section 18

RESUBMITTAL REQUIRED: Grading Plan, Drainage Report Geotechnical Report and SWPPP

The Grading Plan (GP) has been conditionally approved. Drainage Report (DR) has been conditionally approved and the Storm Water Pollution Prevention Plan and Geotechnical Report (GR) have been approved as submitted.

Please address the following review comments prior to the next submittal.

Please include a response letter to the comments along with the corrected copies of the Grading Plan.

Grading Plan:

1. Complied
2. Complied
3. Complied
4. Complied
5. Complied
6. Complied
7. Complied
8. Complied
9. Call out all slopes and stabilization material (concrete, riprap, gabbions or vegetation) in southeast median area. Label grading plan for inspection purposes.
10. Complied
11. Complied
12. Complied
13. Complied
14. Complied
15. Complied
16. Complied
17. Complied
18. Complied
19. Label PAALs and provide dimensions as noted on grading plan.
20. Complied
21. Complied
22. Complied
23. Keynote 7 does not reflect what is called out in the drainage report. Clarify discrepancy and revise accordingly.
24. Complied
25. Complied
26. Verify that all details are provided on plans.
27. Additional comments may be forthcoming.


Drainage report:

Please include a response letter to the comments along with the corrected copies of the Drainage Report.

The drainage report has been accepted. However, seal is needed on response letter. Provide seal on comment letter.


SWPPP:

Seal SWPPP site plan.

Conditions of permit:

GRADING PERMIT CONDITIONS:
The following conditions apply to permit:
1) The permitee shall notify the DSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements, including any scuppers, and their permanent protective devices, and all erosion control measures have been completed, and all conditions of permit are completed. All disturbed areas shall be revegetated or covered with rock or other acceptable material to prevent sedimentation and erosion.
2) Designated concrete washout locations are required and shall not be located in or near the basin or water harvesting areas. Location of temporary material or vehicle staging / stockpile area shall be placed within grading limits and not located in any water harvesting, basin areas, or near the Alamo Wash.
3) Call for Pre-construction meeting, intermediate and final inspections. For a DSD Engineering Inspection, call IVR (740-6970), or contact DSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html
4) There shall be no disturbance outside of the approved disturbance/grading limits, and no grading shall begin until all required SWPPP controls are installed.
5) For inspection purposes, please complete the "AZPDES - Posting Requirements" green sheet, and post at construction entrance of the site at beginning of construction activities and maintain this posted document throughout project construction.
6) A copy of the NOI, Stormwater Pollution Prevention Plan (SWPPP), Grading Plan and Grading Permit shall be kept at the site at all times, until final grading approval.
7) Signatures for the operators on Certification Statements must be on the site copy of the Stormwater Pollution Prevention Plan (SWPPP) at, or before, commencement of construction.
8) Temporary erosion/stormwater controls may be field adjusted with discussions with operators and engineer of record as necessary along disturbance limits for this project.
9) Dust control methods such as water truck will be provided, as well as daily sweeping of the streets.
10) Contact Permits and Codes (791-5100) for any questions regarding any right-of-way permit requirements.
11) Separate building permit applications are required for any walls.
12) Any revision to the Grading Plan may require a re-submittal of a revised grading plan for review. Contact DSD Engineering to discuss changes in grading design.
13) If grading construction is expected to last longer than the expiration date of the grading permit, contact DSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.
14) Prior to final approval, as-builts may be required. Letters of completion for overall project and basin function shall be submitted to DSD..



If you have any questions, I can be reached at 927-4928 or Bianca.Ramirez@tucsonaz.gov
Bianca C. Ramirez
Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4928 office
(520) 879-8010 fax
05/14/2008 DAVID RIVERA ZONING REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
05/19/2008 CPIERCE1 OUT TO CUSTOMER Completed
05/19/2008 CPIERCE1 REJECT SHELF Completed