Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T08BU00094
Parcel: 11508007B

Address:
1346 N STONE AV

Review Status: Completed

Review Details: GRADING

Permit Number - T08BU00094
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/08/2008 JOE LINVILLE NPPO REVIEW Denied Revise the grading plan to correspond with the site plan. An approved site plan is required prior to grading plan approval, except when the two plans are approved simultaneously.
02/13/2008 BIANCA RAMIREZ ENGINEERING REVIEW Approved DATE: February 13, 2008
SUBJECT: Grading Plan
TO: Phil Carhuff
LOCATION: 1346 N Stone Ave, T14S, R13E, Section 1, Ward 3
REVIEWERS: Bianca Ramirez, CFM
ACTIVITY: T08BU00094 (First Review)


RESUBMITTAL REQUIRED: Grading Plan

SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed grading plan for the above referenced property. Engineering Division does not recommend approval of the grading plan at this time. Please address the following review comments prior to the next submittal.

Provide a response letter to the comments along with the corrected copies of the site plan.


Grading Plan:

1. Per review of the site plan. Revise sheets C2.0 and C3.0 to be titles "SITE/GRADING PLAN".
2. Add the following notes to the grading plan notes:
ยท "The approved Grading Plan is the only acceptable construction plan onsite. The Contractor may not use any other plans, such as the approved Tentative Plat and/or Development Plan, for construction purposes. The Contractor may ask the Development Services Inspector to consult with the other approved plans for additional information or details that might not be included on the approved grading plan but needed for completion of work.
3. Verify that north arrow is indicated on sheets accordingly.
4. DS Sec.2.02.2.1.A.16: Provide drainage arrows for roof drainage. Specifically show roof down spout locations for proposed buildings at pedestrian circulation areas. Any scuppers proposed under the sidewalk will be designed and constructed to convey the 10-year flood flow. Provide original copy of scupper calculations that demonstrate that the 10-year flood flow is contained under the sidewalk in the drainage statement. Reference letter on site plan. Include type of scupper in note 26 of sheet C2.0.
5. Call out surface paving material. Include material in details.
6. Indicate depressed curb locations for onsite drainage to enter landscaping areas.
7. Show details of all surface materials.
8. A permit or a private improvement agreement will be necessary for any work performed within the Right-of-way. Contact Permits and Codes at (520) 791-5100 for permit information.
9. Cut or fill slopes require a 2' minimum setback from property line. Indicate or note that no grading will be taking place within 2' setback. Identify area of grading.
10. Provide flow arrows, grades and flow rates within and adjacent to site to show drainage scheme.
11. Call out peak discharges entering and exiting the site.
12. The site plan is currently in review. Any changes made to the site plan must be reflected on the grading plan. The site plan and grading plan must match. For the purpose of this project if the title is revised the sheets provided will be able to be used as site and grading plan.
13. Additional comments may be forthcoming.


If you have any questions, I can be reached at 837-4928 or Bianca.Ramirez@tucsonaz.gov
Bianca Ramirez, CFM
Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4928 office
(520) 879-8010 fax
02/20/2008 CPIERCE1 ZONING REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
02/20/2008 CPIERCE1 OUT TO CUSTOMER Completed