Permit Number: T07SA00225
Parcel: 11449027A

Review Status: Completed

Review Details: LUCAPPS - OVERLAY ZONE REV

Permit Number - T07SA00225
Review Name: LUCAPPS - OVERLAY ZONE REV
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/07/2007 JOE LINVILLE LANDSCAPE REVIEW Approved
11/14/2007 TERRY STEVENS ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Terry Stevens
Lead Planner

PROJECT: T07SA00225
8355 E. Tanque Verde Road
SCZ Overlay Zone Review

TRANSMITTAL: 11/14/07

DUE DATE: 11/21/07

COMMENTS:

1. All required elements of the SCZ (i.e. 30 foot buffer, view corridors, required notes, etc.) as shown on the approved Overlay Zone plan must be added to the development plan, along with date of approval and any conditions placed on that approval. The development plan may not be approved prior to Overlay Zone application approval.

2. Remove the indicated building setback lines from the plan.

Clearly indicate the required 30' buffer as being across the front of the entire parcel. Label the buffer "30 foot undisturbed natural buffer to be preserved and maintained in it's natural state".

3. The view corridor calculations do not appear to be correct. It appears that the percentage is incorrect based on and approximate 158' building frontage. See LUC Sec. 2.8.2.6.B for the correct method of calculating and indicating view corridors. Clearly indicate on the plan the location of the view corridors. A separate sheet may be attached for clarity purposes if needed for indicating the view corridors.

4. Please add the appropriate following notes to the tentative, development, or site plan plat.

a) Revise note #3 in SCZ notes to structure height not to exceed 30 feet. See LUC Sec.2.8.2.5.A.2.


If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961

TLS C:\planning\cdrc\scz\T07CM00225.doc
12/07/2007 MATT FLICK ENGINEERING REVIEW Approved No objection or adverse comment. Drainageways remain in their natural state and the 30' buffer is preserved except at the driveway entrance.
12/10/2007 PATRICIA GEHLEN ZONING-DECISION LETTER WRITE DECISION LETTER Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

December 10, 2007

Robert C. Caylor II
Robert Caylor Construction Co.
6422 East Speedway Blvd. #130
Tucson, Arizona 85710

Subject: T07SA00225 Scenic Corridor Overlay for Tucson Community Church East (D07-0011)

Dear Rob:

Your submittal of October 23, 2007 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a DETAILED cover letter for each agency explaining how each outstanding requirement has been addressed:

ALL BLUELINES MUST BE FOLDED

2 Copies Revised Overlay zone submittal package as detailed in the on line comments (Zoning, DSD).


The public comment period will be opened during the next two weeks.





Should you have any questions, please call me at 837-4919.

Sincerely,


Patricia Y. Gehlen
CDRC Manager