Permit Review Detail
Review Status: Completed
Review Details: PLUMBING
Permit Number - T07PL00159
Review Name: PLUMBING
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/23/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. An easement is required for a waste line to cross a property line. 2. Provide cleanouts at the upper terminal of the sand/oil waste line and at least every 100 feet thereafter. 3. Indicate the slope of the waste piping. 4. Show the size of the existing building sewer. 5. Show the approved fixture that is to be used at the upper terminal of the sand/oil waste line (e.g. trench drain, floor drain) 6. Provide the listing information for the sand/oil interceptor. |
| 01/30/2007 | DROBEY1 | WWM | REVIEW | Needs Review |