Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T07PI00044
Parcel: Unknown

Review Status: Completed

Review Details: PIA SUBMITTAL

Plan Number - T07PI00044
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/04/2008 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied We have reviewed this plan and have the following comments:

1. Sheet 2 - Who will be responcible for the maintenance of the three grate inlet structures?
2. Sheet 2 - Detail 1 - With the roadway sloping towards Pad B, will the expected runoff be contained in the street? If not, vertical curb may provide increased containment.
3. Sheet 2 - Detail 1 - The 4.27' sidewalk seems to include the 2' wedge curb. This would make to proposed sidewalk only 2.27' wide.
4. Sheet 2 - Detail 1- This detail shows a planter. Will there be any proposed landscaping installed with this project? If so, please submit the landscape plan to Paul Rosenboom at 4004 S. Park Avenue, Bld #2 for review.
5. All work in the right of way needs to be coordinated with Paul Rosenboom at 791-5279 ext 234 to prevent damage to existing landscaping and irriagtion.
01/10/2008 GARY WITTWER DOT LANDSCAPE REVIEW Approved
01/16/2008 SMONTIE1 PIA COORDINATOR CUSTOMER CALLED Completed
01/16/2008 JOSE ORTIZ DOT TRAFFIC REVIEW Denied January 16, 2008
ACTIVITY NUMBER: T07PI00044
PROJECT NAME: PAD B Mercado
PROJECT ADDRESS: 100 S Avenida Del Convento
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal.

The following items must be revised or added to the plan.

1. Include a response letter with the next submittal that states how all comments have been addressed.

2. Label existing sidewalks and boundaries of all proposed work.

3. Place the PIA and CDRC Case number on the cover sheet.



If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov
01/16/2008 SMONTIE1 PIA COORDINATOR OUT TO CUSTOMER Completed
12/19/2007 SMONTIE1 UTILITY CLEARANCES COT STREETS DIVISION Denied Please submit utility clearance letters.
12/19/2007 SMONTIE1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied Please submit utility clearance letters.
12/19/2007 SMONTIE1 UTILITY CLEARANCES PC WASTEWATER MGMT Denied Please submit utility clearance letters.
12/19/2007 SMONTIE1 UTILITY CLEARANCES QUEST COMMUNICATION Denied Please submit utility clearance letters.
12/19/2007 SMONTIE1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied Please submit utility clearance letters.
12/19/2007 SMONTIE1 UTILITY CLEARANCES COX COMMUNICATION Denied Please submit utility clearance letters.
12/19/2007 SMONTIE1 UTILITY CLEARANCES SOUTHWEST GAS CORP Denied Please submit utility clearance letters.
12/19/2007 SMONTIE1 UTILITY CLEARANCES EL PASO NATURAL GAS Denied Please submit utility clearance letters.
12/19/2007 SMONTIE1 UTILITY CLEARANCES KINDER MORGAN ENERGY Denied Please submit utility clearance letters.
12/26/2007 THAD HARVISON DOT ENGINEERING REVIEW Denied 1. Provide standard City of Tucson north arrow for Location Map.

2. Provide Type I Sidewalk Scupper Details.

3. Provide storm drain easement DKT and PG. Additionally, the ten-foot storm drain easement must be recorded prior to approval PIA Plans.

4. Provide details for the 18" RCP and Catch Basin tie-in at station 10+00.00.