Review Details: PIA RESUBMITTAL
Plan Number - T07PI00037
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/07/2008 | SMONTIE1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
02/07/2008 | SMONTIE1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
02/07/2008 | SMONTIE1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
02/07/2008 | SMONTIE1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
02/07/2008 | SMONTIE1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
02/07/2008 | SMONTIE1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
02/07/2008 | SMONTIE1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
02/07/2008 | SMONTIE1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Passed | |
02/07/2008 | SMONTIE1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Passed | |
02/22/2008 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
02/29/2008 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
03/03/2008 | Blanca Espino | DOT ENGINEERING | REVIEW | Denied | PIA Plan 1. Please include a detail letter of explanation with the next submittal indicating where and how revisions were made. Single word responses are unacceptable. Include plans/redlines from previous plan submittal. 2. Floodplain Use Permit T07OT01752 does not indicate construction for right-of-way improvements. Correct FUP with DSD to indicate work in the public right-of-way. 3. Indicate Saw-cut area with a hatch or shaded symbol. See redlines. 4. Sheet 2, Indicate the Docket & Page recording for the "New 15' Water Easement." 5. Sheet 3, Indicate the Docket & Page recording for the "Pedestrian Access Easement." 6. This comment was not addressed - Sheet 3, Call out the New Right of way as per RES-2007-011. Remove verbiage, "Existing Right of way." 7. Sheet 4, Detail 4 does not reflect the side slope information as noted on Sheet 2. Hinge points of cut and fill slopes must have a minimum setback of two feet from right-of-way. 8. Handicap ramp located at 22nd & Kolb must be in compliance with A.D.A. guidelines. Indicate a dimensioned detail for all improvements. Truncated Domes required. 9. Construction Note #5 does not coincide with Detail 4 of Sheet 4. Indicate the correct Standard Detail. 10. Remove Sheets S1.0 - S2.1 |
03/07/2008 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Approved | |
03/10/2008 | SMONTIE1 | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
03/10/2008 | SMONTIE1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed |