Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | COT STREETS DIVISION | Completed | |
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | |
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | |
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | |
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | |
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | COX COMMUNICATION | Completed | |
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | |
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | |
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Completed | |
11/07/2007 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
11/27/2007 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Approv-Cond | November 27, 2007 SUBJECT: Rita 244, Offsite, PIA Plan T07PI0025 PROJECT REVIEWER: Richard Leigh, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and recommends tentative approval of the PIA Plan set. The following comments need to be addressed prior to submittal of the mylar plan set. 1. Sheet 4: Indicate the placement of a survey monument at the intersection of Rita Tech Place and Rita Road and label Rita Tech Place. 2. Sheet 7, Detail A and D: Show the proposed onsite drainage channel along Rita Road. If you have any questions, I can be reached at 837-6647 or at Richard.Leigh@tucsoz.gov |
11/29/2007 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Approv-Cond | Traffic Engineering conditionally approves this PIA on the condition that revised traffic signal plans be submitted and approved prior to the submittal of mylars for final signatures. |
11/30/2007 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
12/04/2007 | SMONTIE1 | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
12/04/2007 | SMONTIE1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed |