Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T07PI00025
Parcel: Unknown

Address:
9047 S RITA RD

Review Status: Completed

Review Details: PIA RESUBMITTAL

Plan Number - T07PI00025
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/01/2007 SMONTIE1 UTILITY CLEARANCES COT STREETS DIVISION Completed
11/01/2007 SMONTIE1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Completed
11/01/2007 SMONTIE1 UTILITY CLEARANCES PC WASTEWATER MGMT Completed
11/01/2007 SMONTIE1 UTILITY CLEARANCES QUEST COMMUNICATION Completed
11/01/2007 SMONTIE1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Completed
11/01/2007 SMONTIE1 UTILITY CLEARANCES COX COMMUNICATION Completed
11/01/2007 SMONTIE1 UTILITY CLEARANCES SOUTHWEST GAS CORP Completed
11/01/2007 SMONTIE1 UTILITY CLEARANCES EL PASO NATURAL GAS Completed
11/01/2007 SMONTIE1 UTILITY CLEARANCES KINDER MORGAN ENERGY Completed
11/07/2007 GARY WITTWER DOT LANDSCAPE REVIEW Approved
11/27/2007 RICHARD LEIGH DOT ENGINEERING REVIEW Approv-Cond November 27, 2007

SUBJECT: Rita 244, Offsite, PIA Plan T07PI0025

PROJECT REVIEWER: Richard Leigh, Permits and Codes Section

RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and recommends tentative approval of the PIA Plan set. The following comments need to be addressed prior to submittal of the mylar plan set.

1. Sheet 4: Indicate the placement of a survey monument at the intersection of Rita Tech Place and Rita Road and label Rita Tech Place.

2. Sheet 7, Detail A and D: Show the proposed onsite drainage channel along Rita Road.


If you have any questions, I can be reached at 837-6647 or at Richard.Leigh@tucsoz.gov
11/29/2007 JOSE ORTIZ DOT TRAFFIC REVIEW Approv-Cond Traffic Engineering conditionally approves this PIA on the condition that revised traffic signal plans be submitted and approved prior to the submittal of mylars for final signatures.
11/30/2007 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Approved
12/04/2007 SMONTIE1 PIA COORDINATOR CUSTOMER CALLED; PLANS @ AMBASSADOR Completed
12/04/2007 SMONTIE1 PIA COORDINATOR OUT TO CUSTOMER Completed