Plan Review Detail
Review Status: Completed
Review Details: PIA RESUBMITTAL
Plan Number - T07PI00024
Review Name: PIA RESUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | COT STREETS DIVISION | Approved | |
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Approved | |
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Approved | |
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Approved | |
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Approved | |
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | COX COMMUNICATION | Approved | |
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Approved | |
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Approved | |
11/01/2007 | SMONTIE1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Approved | |
11/07/2007 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
11/20/2007 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | We have reviewed this plan and have the following comments: 1. Sheet 3 &4 - RCP's - The city will need a way to get men and equipment into the basins to maintain the pipes. (ramp of some kind) 2. Sheet 3 & 4 - Basins - Who will be responcible for the maintenance of the basins? |
11/28/2007 | RICHARD LEIGH | DOT ENGINEERING | REVIEW | Denied | November 27, 2007 SUBJECT: Target Fulfillment center West , PIA Plan T07PI0024 PROJECT REVIEWER: Richard Leigh, Permits and Codes Section RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal. 1. Indicate the limits for any for any proposed barricade railing. 2. The roadway names listed on plan set do not correspond with approved tentative plat. Verify and correct. 3. Provide a curb access ramp opposite of the access ramp at the northeast or northwest corner of Rita Tech Place and Target Way. 4. Provide vertical curves for roadway grades, which have an algebraic difference greater than 1%. The minimum desired vertical curve length is 100 feet. 5. The approved drainage report indicated the placement of (3) 36" RCP storm drains at Sta. 14+95.45 Target Way while only two are proposed in the paving plans. Clarify the discrepancy. 6. Who will be responsible for the maintenance for the basin equalizer pipes across Rita Park Place and Target Way? If the development will be responsible for the pipes, indicate it on plan view. If you have any questions, I can be reached at 837-6647 or at Richard.Leigh@tucsoz.gov |
11/30/2007 | SMONTIE1 | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
11/30/2007 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Approv-Cond | Address red-lines provided on the submitted plans prior to the submittal of the mylars. |
11/30/2007 | SMONTIE1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed |