Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: PIA SUBMITTAL
Plan Number - T07PI00009
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/08/2007 | ASHOFFS1 | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | Please submit Utility Clearance Letters. |
02/08/2007 | ASHOFFS1 | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Denied | Please submit Utility Clearance Letters. |
02/08/2007 | ASHOFFS1 | UTILITY CLEARANCES | PC WASTEWATER MGMT | Denied | Please submit Utility Clearance Letters. |
02/08/2007 | ASHOFFS1 | UTILITY CLEARANCES | QUEST COMMUNICATION | Denied | Please submit Utility Clearance Letters. |
02/08/2007 | ASHOFFS1 | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Denied | Please submit Utility Clearance Letters. |
02/08/2007 | ASHOFFS1 | UTILITY CLEARANCES | COX COMMUNICATION | Denied | Please submit Utility Clearance Letters. |
02/08/2007 | ASHOFFS1 | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Denied | Please submit Utility Clearance Letters. |
02/08/2007 | ASHOFFS1 | UTILITY CLEARANCES | EL PASO NATURAL GAS | Denied | Please submit Utility Clearance Letters. |
02/08/2007 | ASHOFFS1 | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | Please submit Utility Clearance Letters. |
02/14/2007 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Denied | 1. Please submit a copy of your approved Native Plant Preservation Ordinace. 2. Please submit a copy of your landscape and irrigation plans. Note: You can not place private irrigation lines under public roadways. Please be sure that you do not have any private irrigation lines under the new roads. |
02/21/2007 | JOSE ORTIZ | DOT TRAFFIC | REVIEW | Denied | Please provide a Signing and Striping plan sheet for Traffic Engineering. If you have any questions, I can be reached at 791-4259 x305 or Jose.Ortiz@tucsonaz.gov |
02/22/2007 | Blanca Espino | DOT ENGINEERING | REVIEW | Denied | PIA Plan 1. Please include a detail letter of explanation with the next submittal indicating where and how revisions were made. Single word sentences are unacceptable. Include plans/redlines from previous plan submittal. Submit Drainage & Geotechnical Reports. 2. Maps and Plats, Book and Page should be noted on cover sheet of subdivision street improvement plans. Plat must be recorded before submittal of mylars for final review and approval. 3. In title block, add assigned I-Plan Number, I-2007-012 to all sheets. 4. Indicate Administrative address on cover sheet. Correct and revise. 5. Remove all Sewer Notes and information other than manholes. 6. Indicate all street and drainage structures. 7. Attached is a copy of the PIA Guidelines and Checklist that shall be applied to all PIA plans. 8. See redlines for additional corrections. |
02/27/2007 | ASHOFFS1 | ENGINEERING | REVIEW | Passed | |
03/09/2007 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Denied | We have reviewed these plans and have the following comments: 1. Is the perferations in the underground detension system to allow water to perk out? Will these pipe hold water? Staning water is a concern with the West Nile Virus. 2. Sheet 3 - What asphalt mix design will be used? (mix #2) 3. Sheet 5 - The entances off of Fairview Buisness Park Place do not show curb access ramps. 4. Will there be any landscaping with this project? If so, please submit a landscape plan to Paul Rosenboom at 4004 S. Park Ave. Bld #2. 5. All work in the right of way needs to be coordinated with Paul Rosenboom at 791-3154 ext 234 to prevent damage to existing landscaping and irrigation. No further comments. 3/9/07 |
03/13/2007 | ASHOFFS1 | PIA COORDINATOR | CUSTOMER CALLED | Completed | |
03/13/2007 | ASHOFFS1 | PIA COORDINATOR | OUT TO CUSTOMER | Completed |