Permit Review Detail
Review Status: Completed
Review Details: FLOODPLAIN
Permit Number - T07OT02072
Review Name: FLOODPLAIN
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/14/2007 | PATRICIA GILBERT | ENGINEERING | REVIEW | Denied | DATE: September 17, 2007 ACTIVITY NUMBER: T07OT020272/T07CM03265 PROJECT ADDRESS: 3128 North Cherry Avenue PROJECT REVIEWER: Patricia Gilbert FLOODPLAIN USE PERMIT IS DENIED RESUBMITTAL REQUIRED: SITE PLAN, FLOODPLAIN USE PERMIT APPLICATION This property is within the FEMA Flood Hazard Area, because of this, very specific notes must be added to the site plan prior to approval. Please provide the requested information on the site plan. The comments are minimal and the next review can be conducted over the counter by the reviewer, Patricia Gilbert. To schedule a time please call at 837-4936. 1. Any structure which is substantially improved at a cost equal to or exceeding 50% of the full cash value of the structure as shown on the latest assessment rolls from the county assessor or an appraisal from a licensed appraiser with the State of Arizona. The submitted cost estimate exceeds 50% of the value of the structure. The addition must elevated one foot above the water surface elevation per the FIRM Panel. The following notes must be added to the site plan; a. The property is subject the Floodplain Ordinance Chapter 26. b. Add a general note to the plan that the entire property lies within a FEMA Flood Hazard Area, Zone AE c. The water surface elevation is 2376.75' and the datum used for this elevation is NGVD 1929. d. The required finish floor elevation of the addition must be 2377.75' NGVD 1929. e. Provide a general note on the site plan that this development contains a requirement that the applicant, or the applicant's authorized representative, complete an Elevation Certificate and is returned to the Development Services Department (DSD) Engineering Division prior to approval of the pre-slab inspection and the final inspection. Both of the original elevation certificates must be returned to the DSD Engineering Division. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/19/2007 | VFLORES1 | OUT TO CUSTOMER | Completed |