Permit Number: T07OT01776
Parcel: 126051510

Address:
3938 E 1ST ST

Review Status: Completed

Review Details: FLOODPLAIN

Permit Number - T07OT01776
Review Name: FLOODPLAIN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/06/2007 JASON GREEN ENGINEERING REVIEW Approved DATE: August 6, 2007
SUBJECT: 3938 E 1st St- Addition and Remodel to an existing Single Family Residence
TO: Juan Castro
LOCATION: T14S R14E Sec10, Ward 6
REVIEWERS: Jason Green, CFM
ACTIVITY: T07CM03194 (Site Plan) and T07OT01776 (Floodplain Use Permit)


SUMMARY: Engineering Division of Development Services Department has received and reviewed the Site Plan (T07CM03194), Floodplain Use Permit (T07OT01776), and the submitted cost estimate for the proposed addition and remodel for the above referenced property. Engineering Division recommends approval of the Site Plan and Floodplain Use Permit at this time.
CONDITIONS OF PERMIT:

1) The associated improvements are with permit activity number T07OT01776 (Floodplain Use Permit) and T07CM031942 (building plans).
2) Any improvements to the structural building for this project are considered a substantial improvement to an existing floodprone structure if the value of this new improvement is 50% or more than the value of the existing structure in present day value. If the project is determined to be a substantial improvement, and, if it is determined that the lowest floor elevation is below the regulatory floor elevation, a design submittal, and review and acceptance of the submittal for flood proofing will be required and shall conform to City of Tucson floodplain development requirements.
3) Cumulative values shall be accounted for the building structure, so that tracking of the 50% status is current. No person shall repair or alter property in a piecemeal manner so as to avoid the provisions of Section 26-4.1.a.3, Chapter 26-Floodplain and Erosion Hazard Management.
4) The applicant attests to the fact that the plans and documents submitted represent all of the improvements that will be done to the existing building, and that all additions, improvements or repairs to the building are included in the construction plans and/or documents herewith. No other improvements, repairs, reconstruction, additions or remodeling have been made to the structure that is not indicated in the attached plans and/or documents.
5) This permit is specific to the improvements specified as an addition and remodel as shown on this plan. It shall not apply to any other structure or property, whether attached or unattached, not specified under this permit.
6) Copies of the improvement plans/permit documents shall be kept in a readily accessible location on site at all times.


If you have any questions, I can be reached at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division

Final Status

Task End Date Reviewer's Name Type of Review Description
08/06/2007 DELMA ROBEY OUT TO CUSTOMER Completed
08/06/2007 DELMA ROBEY REJECT SHELF Completed
08/06/2007 DELMA ROBEY APPROVAL SHELF Completed